Similar Projects
Replace 4 Water Heaters at Cody Middle School (CMS)
Renovation
Design
$200,000 CJ est. value
Cody, WY 82414

Scott A Mohror
Infrastructure
Post-Bid
$330,000 CJ est. value
Jackson, WY 83001

RFQ D/B - Design-build Services of Central High School Riske Field Track Replacement
Infrastructure
Post-Bid
$38,670 CJ est. value
Cheyenne, WY 82009

Old Town Water System Rehabilitation Phase 2
Infrastructure
Results
$1,618,468 CJ est. value
Hanna, WY 82327

Casper Regional Landfill Leachate Force Main Extension
Infrastructure
Results
$174,038 CJ est. value
Evansville, WY 82636

Transfer Station Lift Station Upgrade or Replacement
Renovation
Post-Bid
$88,425 CJ est. value
Cheyenne, WY 82007

Northern Arapaho Business Council Industrial Park Lift Station
Demolition, New Construction, Infrastructure
Results
$321,300 CJ est. value
Arapahoe, WY 82501

Plumbing Contractor Services
Term Contract
Post-Bid
Cheyenne, WY 82001

Sam H. Hobbs WWTP Secondary Treatment Facilities Rehabilitation Project, Phase 2
Infrastructure
Results
$51,995 CJ est. value
Casper, WY 82609

As Needed Minor Plumbing Repairs, Maintenance, Servicing, Diagnostics, Inspections and/or Certification at Thyra Thomson Building
Term Contract
Post-Bid
Casper, WY 82601

Wastewater Treatment Plant Cell Bypass Rehabilitation Project
Renovation, Infrastructure
Results
$1,289,701 CJ est. value
Douglas, WY 82633

Air Compressor and Installation
Renovation
Post-Bid
$50,000 CJ est. value
Cheyenne, WY 82001

Baler Building Leachate System
Infrastructure
Results
$98,400 CJ est. value
Casper, WY 82601

Plumbing Parts
Term Contract
Post-Bid
Cheyenne, WY 82001

Water and Sewer Improvements- South Street Water Main Extension and 11th Street Sewer Replacement
Infrastructure
Post-Bid
$500,000 CJ est. value
Wheatland, WY 82201

Last Updated 09/09/2023 03:03 AM
Project Title

Caisson Wells Rehabilitation and Pump Discharge Piping Modifications Project

Physical Address View project details and contacts
City, State (County) Casper, WY 82601   (Natrona County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $1,268,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes redevelopment of the Joint Powers Boards' three (3) caisson wells (each with two horizontal laterals) and modifications to the lateral isolation valves and the pump discharge piping inside the caisson well buildings. All questions about the meaning or intent of the Bidding Documents shall be submitted to Engineer in writing. Replies will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than ten (10) days prior to the date for opening the Bids will not be answered.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents