Similar Projects
Last Updated | 05/20/2021 08:24 AM |
Project Title | Probst Park Bridge Replacement |
Physical Address | View project details and contacts |
City, State (County) | Tucker, GA (DeKalb County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. Demolish 2 existing bridges (@76’ and @42’). These bridges are rotted and beginning to fail. 2. Construct a single boardwalk from existing trail to up-slope to the parking lot for the park. This will provide proper ADA slope for the new boardwalk. 3. New boardwalk shall be constructed with like material: pillars, supports, treads, handrails with wire mesh. All construction should be wood. 4. New boardwalk shall be 8’ wide and approximately 210 feet long with wire mesh handrails. |
||||||||||||||||||||
Details | Bridge, New Construction.
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |