Similar Projects
Canal Road Widening Project FY22
Infrastructure
Design
$500,000 CJ est. value
Brunswick, GA 31525

Neptune Park Fun Zone Mini-golf Re-landscape Project
Infrastructure
Design
$300,000 CJ est. value
St Simons Is, GA 31522

Construction of a Roundabout on US 17/SR 25
Infrastructure
Bidding
$2,000,000 CJ est. value
Anguilla, GA 31523

Glynn County Fire Station #2 ADA Upgrade Project
Infrastructure, Renovation
Bidding
$600,000 CJ est. value
St Simons Is, GA 31522

Neptune Park Main Pool Re-Plaster Project
Renovation, Infrastructure
Sub-Bidding
$150,000 CJ est. value
St Simons Is, GA 31522

St. Simons Elementary School Phase 1 Site Work
Post-Bid
Brunswick, Saint Simons Island, GA 31525

Blythe Island Regional Park Maintenance Barn
New Construction
Post-Bid
GA

Howard Coffin Park Pavilion
New Construction
Results
Brunswick, GA 31520

North Glynn Batting Pavilion
New Construction
Results
Brunswick, GA 31520

Brunswick Travel Center
New Construction, Infrastructure - 136,000 SF
Pending Verification
$20,000,000 CJ est. value
Brunswick, GA 31525

Buc-ees Travel Center - City Of St Simons Island
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
St Simons Is, GA 31522

Tru by Hilton / Brunswick
New Construction, Infrastructure - 68,467 SF
Design
$7,000,000 CJ est. value
Brunswick, GA 31523

Department of Public Health ADA Upgrade Project FY 2023
Infrastructure, Renovation
Bidding
$150,000 CJ est. value
Brunswick, GA 31520

On-Call Boring Services
Infrastructure
Post-Bid
Brunswick, GA

South Palm and Hornet Ditch Drainage Improvements
Infrastructure
Results
$5,960,408 CJ est. value
Brunswick, GA 31520

Last Updated 08/16/2022 03:38 PM
Project Title

Picnic Shelter

Physical Address View project details and contacts
City, State (County) St Simons Is, GA 31522   (Glynn County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $95,100 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 10, 2022, the project has been awarded. A timeline for construction has not been confirmed. THIS IS A PRE-SOLICITATION NOTICE ONLY. The National Park Service, South Major Acquisition Buying Office intends to issue a solicitation to construct a picnic shelter within Fort Frederica National Monument located in Saint Simons Island, Georgia, 31522, Glynn County. SOLICITATION NUMBER: 140P5422R0022. This project includes clearing vegetation from the surface of the existing concrete slab and surrounding area, preparing the existing slab, pouring a new slab and constructing a shelter over the location with a simple gable roofed structure. A detailed Statement of Work (SOW) will be provided with the solicitation documents. This procurement is 100% set-aside for Small Businesses using NAICS code of 238990. The small business standard is $16.5M. The cost range is between $25,000 and $100,000. All interested offers MUST have an active vendor record in SAM.gov, be a small business under the identified NAICS code and NOT have any exclusions such as a delinquent federal debt or debarment. SITE VISIT: Only (1) one group site visit is scheduled for this action on June 15, 2022 at 10:00am (ET) in Saint Simons Island, GA. Details will be provided with the solicitation. Any questions must be received via email by 10:00am (ET) on June 21, 2022 to Mary_Stefanos@nps.gov. TYPE OF CONTRACT: A firm-fixed-price contract is expected to be awarded towards the beginning of July 2022. Note: Davis Bacon prevailing wages for Glynn County, GA will apply. The Government intends to award (1) one contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation, will be most advantageous to the Government, price and other factors considered. The solicitation will be posted on SAM.gov on or about May 27, 2022. This date is subject to change. Hard copy documents including drawings will not be available - all available documents will be posted for download. Offers will be due no earlier than 30 days after issuance of solicitation unless extended by amendment. This notice is for informational purposes only and is not a request for submission of offers. The Government is not obligated to issue a solicitation as a result of this notice. No other information is available until issuance of the solicitation. After issuance of solicitation, send any inquires via email to Mary_Stefanos@nps.gov by 10:00am (ET) on June 21, 2022. NO oral questions will be accepted. The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. 1. TASKS: a) Clearing and Grubbing b) Grub, trim and cut approximately 60 cubic yards of brush, small trees and limbs. c) Dispose of approximately 20 cubic yards of concrete rubble. d) Cut, remove, and dispose of trees and stumps (one 18"x 50' pine, one 3'x 25' e) dead oak, ten 8"-16" x 40' cedars, pines and oak trees). 2. Demolition: Flush cut, four galvanized pipes, that are extending from concrete slab. Galvanized pipes are 2"x 12", 1"x 6", 3/4"x 18" and 1/2 "x 6". 3. Installation a) Clean debris from existing slab and pressure wash entire 1300 square feet. b) Place a layer of at least 4 MIL thick plastic sheeting over the existing, cleaned concrete slab. c) Pour a 4" thick, 3000 psi, concrete slab over the existing concrete slab. The existing slab measures 30'x 40'. Slab is to have a fine, broom finish. d) Place #4 steel rebar, in a 2'x 2' grid, midway of the thickness of the new concrete slab and sidewalk. e) Rebar is to be tied at each area where rebar crosses each, with at least 16-gauge, rebar wire. f) Install two, ABA compliant sidewalks (one on the south side and one on the west side of the concrete slab. Each sidewalk is 5' wide, approximately 30' long and 4" thick. g) Install an expansion joint at the points where each sidewalk meets the concrete slab and cut "Control" joints in both the slab and the sidewalk. The control joints in the sidewalk should be 1/2 "- 3/4 " deep and every 10 feet. The control joints in the slab, should be placed in the middle of the 30' length and two joints, evenly spaced within the 40-foot length *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 13 - Special Construction, Common Work Results for Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents