Similar Projects
Utilities - US 60
Infrastructure
Design
$992,109 CJ est. value
Bluejacket, OK 74333

Bridge Rehabilitation - US 69
Infrastructure
Design
$1,320,760 CJ est. value
Vinita, OK 74301

Resurface (Asphalt) - SH-10
Infrastructure
Bidding
$1,356,356 CJ est. value
Welch, OK 74369

Resurface (Asphalt) - SH-10
Infrastructure
Bidding
$1,356,356 CJ est. value
Welch, OK 74369

Vinita Public Library ADA Renovations to an Existing Facility
Infrastructure, Renovation
Post-Bid
$300,000 CJ est. value
Vinita, OK 74301

Vinita Public Library ADA Renovations to an Existing Facility
Infrastructure, Renovation
Post-Bid
$300,000 CJ est. value
Vinita, OK 74301

Slabjacking and Subsealing Services
Infrastructure
Results

Resurface (Asphalt)-SH-10
Infrastructure
Results
OK

Pavement Rehabilitation - US 69
Infrastructure
Design
$4,907,700 CJ est. value
Vinita, OK 74301

Construction of Certain Improvements on the Water Tower 10 Repair and Repainting Project
Renovation, Infrastructure
Post-Bid
$70,000 CJ est. value
Vinita, OK 74301

Resurface (Asphalt)-SH-10
Infrastructure
Results
OK

Utilities - US 60
Infrastructure
Design
$1,838,192 CJ est. value
Bluejacket, OK 74333

Electric High Voltage Transmission Line Reconstruction Contractors
Infrastructure
Post-Bid
$200,000 CJ est. value
Vinita, OK 74301

Resurface (Asphalt) - SH-10
Infrastructure
Results
OK

Vinita Public Library
Infrastructure, Renovation - 6,600 SF
Post-Bid
$280,000 CJ est. value
Vinita, OK 74301

Last Updated 02/15/2023 07:34 AM
Project Title

US 69 - Bridge and Approaches

Physical Address View project details and contacts
City, State (County) Vinita, OK 74301   (Craig County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected September 2024
Bids Due View project details and contacts
Estimated Value $1,871,156 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

US-69 Over Billingslie Creek, 4.6 Miles North of the Mayes C/l As of February 15, 2023, the project is in design status. Anticipated letting month/year is January, 2024. Length : 0.100 Mi OKDOT - US 69 - Bridge and Approaches *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents