Similar Projects
Last Updated | 08/18/2022 08:05 PM |
Project Title | Maintenance of Bayport Stormwater Treatmnt Pond |
Physical Address | View project details and contacts |
City, State (County) | Alameda, CA 94501 (Alameda County) |
Category(s) | Single Trades |
Sub-Category(s) | Service/Term Contracts |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Maintenance of the Bayport Stormwater Treatment Pond. The Bayport Stormwater Treatment Pond is a wet detention basin constructed in 2005 to receive runoff from the Bayport residential area and Alameda Landing commercial areas, within Alameda, California. The treatment pond has a 1.8 acre surface area and is designed to hold a permanent pool of water up to 4.5 feet deep during non-wet weather conditions, and have capacity to capture 4.5 acre feet of stormwater runoff. The Bayport Stormwater Treatment Pond requires routine inspection and maintenance services to remain operational and effective with treatment. Faxed, mailed or hand carried quotations will not be accepted. Any questions pertaining to this Request for Quotation shall be sent by August 9, 2022 at 5:00 p.m.to Liz Acord, lacord@alamedaca.gov and cc'd to Jeanette Navarro, jnavarro@alamedaca.gov. Answers to questions, if any, will be posted at August 11, 2022 |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |