Similar Projects
Ward Boulevard Retail Development
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Wilson, NC 27893

Ward Boulevard Retail Development
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Wilson, NC 27893

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Milling and Resurfacing
Infrastructure
Bidding
$5,000,000 CJ est. value
Wilson, NC 27893

Sandy Creek Drive Culvert Replacement
Infrastructure
Post-Bid
$291,595 est. value
Wilson, NC 27893

Natural Gas System Improvements
Infrastructure
Post-Bid
$315,000 CJ est. value
Wilson, NC 27893

Grading, Drainage, and Paving
Infrastructure
Results
NC

Grading, Drainage, Paving, and Structure
Infrastructure
Results
NC

ABEC Manufacturing Facility
New Construction, Infrastructure - 50,000 SF
Pending Verification
$11,000,000 CJ est. value
Wilson, NC 27893

ABEC Manufacturing Facility
New Construction, Infrastructure - 50,000 SF
Pending Verification
$11,000,000 CJ est. value
Wilson, NC 27893

Fike High School Tennis Court Reconstruction
Infrastructure
Bidding
$240,000 CJ est. value
Wilson, NC 27893

Underground Primary Replacement
Infrastructure, Alteration
Post-Bid
$700,000 est. value
Wilson, NC

Pavement Rehabilitation
Infrastructure
Results

Heatherton Grove
New Construction, Infrastructure
Pending Verification
$7,000,000 CJ est. value
Wilson, NC 27896

Headwall Seven Locations
Infrastructure
Post-Bid
Lucama, NC

Last Updated 12/05/2022 03:15 PM
Project Title

Lodge Street Parking Lot Improvements

Physical Address View project details and contacts
City, State (County) Wilson, NC 27893   (Wilson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $491,987 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Infrastructure improvements for culvert replacement as indicated on plans by Bartlett Engineering & Surveying, PC, titled "Lodge Street Parking Lot", dated April 22, 2022, including, but not limited to demolition/removals, pavement, curb, striping/signage, concrete sidewalk, storm drain removal/replacement, and storm drain installation. Only bid packages that are submitted using the Purchase Order Contract Proposal with the bid form provided by the City of Wilson still attached will be considered for this project. The bid shall not contain any unauthorized additions, deletions, or conditional bids. The date of availability for this contract is on or before June 9, 2022. The completion date for this contract is November 9, 2022. Except where otherwise provided by the contract, observation periods required by the contract will not be a part of the work to be completed by the completion date and/or intermediate contract times stated in the contract. The acceptable completion of the observation periods that extend beyond the final completion date shall be a part of the work covered by the performance and payment bonds. Liquidated damages for this contract are Five Hundred Dollars ($500.00) per calendar day. All qualified Proposals will be evaluated, and an award will be made to the firm(s) whose Proposal is deemed to be in the best interest of the City of Wilson, all factors considered. The City of Wilson reserves the unqualified right to reject any or all offers if determined in its best interest. Liquidated damages for this contract are Five Hundred Dollars ($500.00) per calendar day.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents