Similar Projects
Design Build Services for Route 37, Contract 3 (Bridge Group 51B)
Post-Bid
Providence, RI

Walking Path Bridge Refurbishment-Memorial Park
Post-Bid
Johnston, RI 02919

2020-CB-018 Bridge Group 32 I-95 Cranston
Results
Cranston, RI

Steel Repairs to Branch Avenue Railroad Bridge
Results
Providence, RI 02904

Bridge Group 45C H Cottrell Bridge
New Construction
Post-Bid
Westerly, RI

Pell Bridge Ramps - Phase II
Results
Providence, RI

Bridge Group 95 - Route 4/95 and Route 403 Ramps
New Construction
Post-Bid
Providence, RI

Bridge Group 59C - Reconstruction of Reservoir Avenue RR Bridge
Results
Providence, RI

Bridge Group 69E - Hunts Mill
New Construction
Post-Bid

Bridge Group 57J Browning Mill
Results
Exeter, RI

Silver Creek Bike Path Culvert Bridge
New Construction
Post-Bid
Bristol, RI

Design Build Services for I-195 Washington Bridge Phase 2
New Construction
Results
Providence, RI

On-Call Contractor General Bridge Preservation Task Order Program
Renovation, Infrastructure
Post-Bid
RI

Gilbert Stuart Bridge No. 103701 Replacement
Renovation
Results
$585,830 est. value
North Kingstown, RI

Design/Build Services for East Bay Bike Path Bridge Replacement
Renovation, Infrastructure
Post-Bid
Providence, RI

Reported 05/18/2022 12:00 AM
Project Title

High Priority Repairs on Bridges 062401, 075401, and 098601

Physical Address View project details and contacts
City, State (County) Smithfield, RI   (Providence County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

RIC 2021-CB-056 consists of repairing select deteriorated steel beam ends on Bridges 062401, 075401, and 098601, as required. All repairs shall be performed at the locations and to the extents indicated on the Contract Plans and documents, in accordance with the latest edition of the Rhode Island Standard Specifications for Road and Bridge Construction including all supplemental revisions, and as directed by the Engineer. The work encompassed by this project shall include, but is not limited to, the following: installation and removal of temporary work platforms; furnish, fabricate and erect beam end steel repairs as shown on the plans; maintenance and protection of traffic; protection of utilities; and all incidentals necessary to complete the work under this Contract to the satisfaction of the Engineer.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents