Similar Projects
South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Willis Hodges Road Reconstruction
Infrastructure
Bidding
$817,296 CJ est. value
Macclenny, FL 32063

Willis Hodges Road Reconstruction
Infrastructure
Bidding
$817,296 CJ est. value
Macclenny, FL 32063

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

SR 8 - Resurfacing
Infrastructure
Results
$38,211,551 est. value

Asphalt and Sidewalk Rehabilitation
Infrastructure
Results

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Resurfacing - SR 8
Infrastructure
Bidding
$17,108,404 CJ est. value
Glen Saint Mary, FL 32040

SR 25 (US 41 / US 441) from I-75 (SR 93) to CR 252
Infrastructure
Post-Bid
$9,805,526 est. value

Silicone Joint Sealer
Infrastructure
Results

Baker County Central Fire Rescue Station Paving
Infrastructure
Post-Bid
Glen Saint Mary, FL 32040

District Two Bridge Tending Services
Infrastructure
Results

Routine Mechanized Road/Bridge Sweeping
Infrastructure
Post-Bid
$150,000 est. value
Sanderson, FL

Last Updated 06/29/2023 04:47 PM
Project Title

Interchange - Add Lanes/Milling and Resurfacing/Grading (Excavation)

Physical Address View project details and contacts
City, State (County) Macclenny, FL 32063   (Baker County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $10,495,523 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Counties: Baker Road Name: Sr 8 (I-10) Limits: At Sr 121 Interchange Project(s): 43574515201(*) Federal Aid No: N/A Total Roadway Length: 0.477 Miles Contract Days: 250 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.477 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 Days The improvements under this contract consist of milling and resurfacing, base work, shoulder treatment, drainage improvements, curb and gutters, traffic signals, lighting, highway signing, guardrail, and other incidental construction at the SR 8 (I-10) and SR 121 Interchange in Baker County. This contract is being funded by the American Rescue Plan Act (ARPA). For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 001 Interchange - Add Lanes/Milling and Resurfacing/Grading (Excavation)

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents