Similar Projects
East Park Street Utility Improvement Project
Infrastructure, Alteration
Bidding
$200,000 est. value
Carson City, NV 89706

Multi-Purpose Athletic Center (MAC) West Parking Lot
Infrastructure
Bidding
$376,124 est. value
Carson City, NV 89706

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

ADA Upgrades, Warm Springs Correctional Center
Infrastructure
Post-Bid
$490,000 est. value
Carson City, NV 89701

Chip Seal with Fog Seal
Results
$1,550,000 to $1,850,000 est. value

Slurry Seal and Chip Seal
Results
$1,300,000 to $1,550,000 est. value

2022 Parking Lot Pavement Preservation Project
Infrastructure
Bidding
$275,000 est. value
Carson City, NV

2 Inch Overlay
Results
$3,200,000 to $3,850,000 est. value

2022 Long Line Pavement Striping Project
Infrastructure
Bidding
$200,000 est. value
Carson City, NV

2021 Curry Street and 3rd Street Parking Lot Improvements
Results
Less than $2,200,000 est. value
Carson City, NV

Chip Seal
Results
NV

NV Flap 39(1) Kings Canyon Road
Results
$2,000,000 to $5,000,000 est. value
Carson City, NV 89703

Deer Run Road Pavement Preservation Project
Infrastructure
Results
$200,000 est. value
Carson City, NV

Clear Creek Road Pavement Preservation Project
Infrastructure
Results
$110,000 est. value
Carson City, NV

Health Parking Lot Rehabilitation Project
Infrastructure
Results
$216,450 est. value
Carson City, NV

Last Updated 05/04/2022 02:12 AM
Project Title

Fifth Street / Carson River Road Right Turn Pocket Project

Physical Address View project details and contacts
City, State (County) Carson City, NV 89701   (Carson City County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $185,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Carson City is accepting sealed bids for all labor, materials, tools and equipment necessary for the Fifth Street/Carson River Road Right Turn Pocket Project. The project includes construction of a new right turn pocket at the intersection of Fifth Street and Carson River Road as well as path construction, storm drain improvements and concrete sidewalk, curb and gutter installation.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents