Similar Projects
Waterview Drive Warehouse
New Construction - 80,000 SF
Conception
Shelton, CT

Pepper Street Warehouse
New Construction - 28,814 SF
Conception
Monroe, CT 06468

King Street Distribution and Flex Buildings
New Construction - 600,350 SF
Design
Enfield, CT

Warehouse / Office Mixed - Use
New Construction - 250,000 SF
Design
$10,000,000 CJ est. value
Wallingford, CT 06492

Storage Building Renovations (S)
Renovation
Bidding
$600,000 est. value
Stamford, CT 06902

Newington Avenue Self-Storage
New Construction - 34,042 SF
Bidding
$10,000,000 est. value
Waterbury, CT 06705

Storage Outbuilding-Carrigan Intermediate School
Renovation, Addition
Post-Bid
West Haven, CT 06516

Replacement of Salt Shed Cover
Renovation
Post-Bid
$500,000 est. value
Torrington, CT 06790

Rehabilitation of Salt Sheds
Results
$500,000 to $999,999 est. value
Stafford, Union, Vernon, CT 06614

Development Planning Services for the Connecticut Regional Agriculture Market
New Construction
Results
Hartford, CT

Summer Street Warehouse
Addition - 4,605 SF
Construction
$1,000,000 est. value
Stamford, CT 06905

Warehouse
New Construction - 3,200 SF
Construction
$100,000 est. value
Bloomfield, CT

150 Dividend Road Mixed Use
New Construction - 30,750 SF
Pending Verification
Rocky Hill, CT 06067

West Street Mixed-Use
New Construction
Pending Verification
Litchfield, CT

Lordship Boulevard Warehouse
New Construction - 169,622 SF
Conception
Stratford, CT 06615

Last Updated 06/29/2022 08:17 AM
Project Title

Municipal Transfer Station Project at 100 Olsen Farm Road

Physical Address View project details and contacts
City, State (County) Coventry, CT 06238   (Tolland County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $550,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes, but is not limited to, the installation of a Municipal Transfer Station located at 100 Olsen Farm Road. The contractor shall be responsible for but not limited to: maintaining overall site conditions, maintaining access to towns public works facility, installing and maintaining erosion control measures, installation of Transfer Station and restoration of site.

Details

Warehouse/Storage, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents