Similar Projects
Helix Building
New Construction - 250,000 SF
Sub-Bidding
$78,439,728 est. value

Usu Mountain View Residence Hall- Design Assist Package
Post-Bid
Logan, UT

Usu New Biological Engineering Building
Post-Bid
Logan, UT 84341

DFCM Construction-USU Biology & Natural Resource Renovation CMGC
Renovation, Addition - 60,000 SF
Results
Less than $18,500,000 est. value
Logan, UT

Construction Management and General Contractor Services
New Construction - 40,000 SF
Results
Less than $10,000,000 est. value
Logan, UT 84341

Construction Management/General Contractor for Mountain View Residence Hall Replacement
Construction
Less than $32,000,000 est. value
Logan, UT

USDA Bee Lab Remodel for Utah State University
Post-Bid
Logan, UT

Taggart Student Center Remodel
Renovation
Results
Logan, UT 84322

HPER Building Nursing Offices
Renovation
Post-Bid
$425,000 est. value
Logan, UT 84322

Utah State University North Athletic Fields Phase
Results
Logan, UT

University of Utah Coal Yard Storage Building
Results
Logan, UT 84341

Agricultural Science Bike Shelter
Results
Logan, UT

Caine College Arts Academic Advising Center Renovation
Renovation
Results
Logan, UT 84322

USU David B Haight Center Remodel
Results
Logan, UT 84321

Utah State University Mountain View Student Housing
New Construction - 134,000 SF
Results
Logan, UT 84321

Last Updated 10/02/2020 07:02 PM
Project Title

DFCM Construction Pre-Qualified General - Bridgerland Tech Machine Shop Renovation

Physical Address View project details and contacts
City, State (County) Logan, UT 84321   (Cache County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $192,023
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Existing classroom and machine shop remodel. Existing classroom risers are to be removed, and existing south classroom block wall to be removed and existing drop down ceiling. New paint and light fixtures are to be provided throughout. New spiral ducting in the classroom area and new cementitious epoxy based flooring are to be installed. Three new windows are to be installed between the classroom and existing corridor.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents