Similar Projects
Rhyne Terraces
New Construction, Infrastructure
Conception
$30,000,000 CJ est. value
Gastonia, NC 28052

Sewer Expansion - Southern I-85 Area - Davidson County
Infrastructure
Conception
$38,423,583 CJ est. value
Bessemer City, NC 28016

Kendrick Townhomes
New Construction, Infrastructure
Design
$32,000,000 CJ est. value
Gastonia, NC 28052

Ovata at Blackwood Creek
New Construction, Infrastructure
Design
$29,000,000 CJ est. value
Gastonia, NC 28052

Oak Commerce Center - Building I
New Construction, Infrastructure - 471,860 SF
Bidding
$30,600,000 CJ est. value
Belmont, NC 28056

Vantine Pump Station and Sewer Replacement
Renovation, Infrastructure
Bidding
$1,800,000 CJ est. value
Bessemer City, NC 28016

Oak Commerce Center - Building I
New Construction, Infrastructure - 471,860 SF
Post-Bid
$30,600,000 CJ est. value
Belmont, NC 28056

Project Stingray
New Construction, Infrastructure - 665,722 SF
Post-Bid
$43,300,000 CJ est. value
Gastonia, NC 28052

Water System Extension to Serve Paul Beam Road Area Near Cherryville
Infrastructure
Results
$997,018 CJ est. value
Cherryville, NC 28021

Speed Humps 2022
Infrastructure
Results
$53,684 CJ est. value
Gastonia, NC 28052

Premix Inc. Manufacturing Plant
New Construction, Infrastructure - 66,000 SF
Construction
$50,000,000 CJ est. value
Dallas, NC 28034

Belmont Abbey College
New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Belmont, NC 28012

Howe's Landing
New Construction, Infrastructure
Pending Verification
$340,000,000 CJ est. value
Gastonia, NC 28056

RFQ Engineering - Long Creek Outfall Preliminary Engineering Report (PER)
Renovation, Infrastructure
Pending Verification
$250,000 CJ est. value
Gastonia, NC 28054

FUSE - Silent Crossing at Trenton Street - City of Gastonia
Infrastructure
Conception
$488,878 CJ est. value
Gastonia, NC 28052

Last Updated 07/18/2023 11:36 AM
Project Title

North Belmont Booster Pump Station

Physical Address View project details and contacts
City, State (County) Belmont, NC 28012   (Gaston County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $1,144,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project has an expected duration of 210 days. For information regarding this Invitation to Bid, contact as follow: Scott Snyder HDR Engineering Inc. 15 South Main Street, Suite 601, Greenville, SC 29601 Phone: 864-631-0439 Email: scott.snyder@hdrinc.com The work included as part of this project includes constructing a concrete foundation for a new package booster pump station with associated electrical, HVAC, site clearing, grading and I&C specialties. Work also includes providing and setting package booster pump station, tapping, existing, 16 IN diameter water line and installing necessary fittings, pipe, valves, check valves, emergency natural gas generator and gas feed, appurtenances and specialties and pressure testing and disinfecting prior to commissioning

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents