Similar Projects
Lift Station #6 Replacement
Results
Less than $287,100 est. value
Edgewater, FL 32132

Phase 4B Lake Monroe Intake, Pump Station and Raw Water Transmission Main Project
New Construction
Post-Bid
$10,000,000 est. value
Deltona, FL

LPGA Lift Station 97 Rehabilitation
Results
$714,510 to $924,660 est. value
Daytona Beach, FL

Lift Station Maintenance and Repair
Post-Bid
Daytona Beach, DeBary, DeLand, Oak Hill, Orange City, Ormond Beach, Ponce Inlet, Port Orange, FL 32124

Hope Place Lift Station Replacement
Results
Less than $128,000 est. value
Holly Hill, FL

Wilmette Avenue Stormwater Pump Station
Results
Less than $305,904 est. value
Ormond Beach, FL 32173

Lift Station #9 Replacement
Results
Less than $320,908 est. value
Holly Hill, FL 32117

Westside Water Reclamation In-Plant Pump Station and Headworks - Design-Build
Results
$18,000,000 to $20,000,000 est. value
Daytona Beach, FL

Ponce Inlet Lift Station Building Remodel
Results
Less than $150,000 est. value
Ponce Inlet, Port Orange, FL 32127

Lift Station #10 Rehabilitation
Results
Less than $299,750 est. value
Holly Hill, FL 32117

PEP Tank Replacement
Results
Ormond Beach, FL 32175

Kmart Pump Station Improvements
Results
Less than $585,000 est. value
De Land, FL 32720

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Herbert and Nova Master Lift Station Rehabilitation
Bidding
Port Orange, FL

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

Last Updated 04/02/2021 09:05 AM
Project Title

NW Reclaimed Water Storage Tank and Pump Station

Physical Address View project details and contacts
City, State (County) DeLand, FL   (Volusia County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a new 2.0 MG reclaimed water storage tank and pump station for the City’s NW service area.

Details

Lift and Pump Stations, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents