Similar Projects
RFP Design - Design and Construction of Mckee Run Control House
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Dover, DE 19904

Puncheon Run Transmission Bypass - Kent County
Infrastructure
Conception
$2,600,000 CJ est. value
Dover, DE 19904

Smyrna Farmers Market
Demolition, New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Smyrna, DE 19977

Commerce Way Warehouse/ Modani Dover
New Construction, Infrastructure - 234,000 SF
Design
$25,516,900 CJ est. value
Dover, DE 19904

Whispering Pines Mobile Home Park Septic Elimination Project - Phase 2
Infrastructure
Bidding
$800,000 CJ est. value
Dover, DE 19904

DSU Phase 1 Grossley Hall Demolition - Bid Package C - Demolition/Sitework
Demolition, Infrastructure
Bidding
$500,000 CJ est. value
Dover, DE 19901

Calvary Baptist Church / Dover
New Construction, Infrastructure - 27,000 SF
Post-Bid
$9,000,000 CJ est. value
Dover, DE 19904

Laboratory Expansion - Bid Package 2: Steel, Carpentry, General Work
Addition, Demolition, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Smyrna, DE 19977

IDIQ- Epoxy Pavement Markings (District II)
Infrastructure
Results

New Agriculture Building Design-Build Services
New Construction
Results
Dover, DE

1165 South DuPont Boulevard Mixed Use Development
New Construction, Infrastructure - 57,600 SF
Pending Verification
$15,000,000 CJ est. value
Smyrna, DE 19977

1165 South DuPont Boulevard Mixed Use Development
New Construction, Infrastructure - 57,600 SF
Pending Verification
$15,000,000 CJ est. value
Smyrna, DE 19977

Route 13 Forcemain Relocation - South Dover - County of Kent
Infrastructure
Conception
$5,000,000 CJ est. value
Dover, DE 19901

Scotton Landing Boat Ramp Reconstruction
Infrastructure
Bidding
$465,000 CJ est. value
Dover, DE 19901

Construction Management Services
Renovation, Term Contract
Post-Bid
Dover, DE 19901

Last Updated 04/26/2023 10:24 AM
Project Title

Critical Capital Needs/Deferred Maintenance - Delaware Technical Community College

Physical Address View project details and contacts
City, State (County) Dover, DE 19904   (Kent County)
Category(s) Education, Heavy and Highway
Sub-Category(s) College/University, Parking Garage, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $33,451,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Projects include renovation and water intrusion mitigation at the Wilmington Campus; major renovations to the HVAC and electrical systems at the Stanton Campus; major replacement of heat pumps at the Stanton Campus; renovation and replacement of the HVAC and roofing systems at the Dover Campus; replacement of the chiller system at the Owens Campus; renovations for accessibility at the Stanton and George Campuses; gymnasium improvements at the Stanton Campus; and repaving projects located at each campus. As of June 29, 2022, this project is included in the Delaware Technical Community College FY 2022-2024 CIP. Information regarding design team and contractor selection has not been disclosed. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents