Similar Projects
Cornerstone at Seminole Woods
New Construction, Infrastructure - 103,005 SF
Conception
$27,000,000 est. value
Bunnell, FL 32110

Par Builders Storage
New Construction, Infrastructure - 103,255 SF
Design
$11,000,000 est. value
Bunnell, FL 32110

Par Builders Storage
New Construction, Infrastructure - 103,255 SF
Design
$11,000,000 est. value
Bunnell, FL 32110

L-4 Weir Replacement
Infrastructure
Bidding
$1,400,000 CJ est. value
Palm Coast, FL 32137

K-Section Drainage Improvements
Infrastructure
Bidding
$30,000,000 CJ est. value
Palm Coast, FL 32137

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

FY2022 Road Paving Project
Infrastructure
Post-Bid
Palm Coast, FL

Graham Swamp Trail and Pedestrian Bridge Over State Road 100
Results
Less than $8,449,230 est. value
FL

Mandarin Road Loop Water Main Connection
Results
Less than $356,435 est. value
Jacksonville, FL 32223

Maintenance and Operations Facility - City of Palm Coast
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Palm Coast, FL 32137

The Tribute
New Construction, Infrastructure
Pending Verification
$95,000,000 CJ est. value
Palm Coast, FL 32137

Wilton Palm Coast
New Construction, Infrastructure
Design
$95,000,000 CJ est. value
Palm Coast, FL 32164

FY 2022/2023 Stormwater Modifications
Infrastructure
Bidding
$5,000,000 CJ est. value
Flagler Beach, FL 32136

Construction Manager at Risk (CMAR) for Flagler County Library Joint Use Facility
New Construction, Infrastructure - 33,000 SF
Post-Bid
$16,000,000 est. value
FL

Refurbishment of Five City Parking Lots
Results
$65,041 est. value
Flagler Beach, FL

Last Updated 08/04/2022 02:10 PM
Project Title

K-Section Drainage Improvements

Physical Address View project details and contacts
City, State (County) Palm Coast, FL 32137   (Flagler County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractorshall provide all work required including, but not limited to, labor,supervision, traffic control, materials, equipment, installation, and incidentals required. Contractor shall also provide material samples, as necessary, to ensure compliance with manufacturer's recommendations. Installation of all materials shall be in accordance with all applicable CITY standards and requirements, applicable Florida Departments of Transportation (FDOT) Standard Specifications for Road and Bridge Construction (latest edition), manufacturer and industry preferred standards. Work assigned under this contract may include, but is not limited to, the following: Is requesting proposals from qualified vendors. This project consist of upsizing Stormwater conveyances at four (4) sites in the Quail Hollow neighborhood (K-Section) within the City of Palm Coast. Contractors will be responsible for demolition /removal of the existing Stormwater conveyances and replacing with Concrete Box Culverts (CBC's) according to site-specific construction plans; and all other incidental work necessary to provide a completed project in accordance with the contract documents. Total construction time to achieve Substantial Completion at each site is forty-five (45) consecutive calendar days from the date of the "Notice to Proceed," with an additional fifteen (15) consecutive calendar days to achieve Final Completion Allsubmittals will be evaluated by City staff in accordance with the criteria set forth in the bid documents. It is the intent of The City to award each culvert crossing as its own stand-alone project to the corresponding lowest bid. The City reservesthe right to reject all bids/submittals, and to solicit and re-advertise for new bids, or to abandon the project in its entirety at any time during the process including, but not limited to, after the Notice of Intent to Award. All prospective Bidders are hereby instructed not to contact any member of the City of Palm Coast City Council, City Manager, or City of Palm Coaststaff members other than the noted contact person(s) regarding this bid/request at any time prior to the bid/request having been formally presented to, and voted on by, the City Council. Any such contact shall be cause for rejection of your bid/request submittal. Any questions concerning the intent, meaning and interpretations of the bid documents including the draft agreement, shall be requested in writing through the City's Procurement Portal QUESTION DEADLINE: July 28, 2022 at 2:00 PM A Bid Bond shall accompany each Bid if the Bid amount is one-hundred thousand dollars ($100,000) or greater. The Bid Bond shall be for an amount not less than five percent (5%) of the Bid price and shall be made payable to the City as a guarantee that the Bidder will not withdraw his/her Bid for a period of one hundred twenty (120) days after the Bid closing time. In the event the Contract is awarded to the Successful Bidder and will enter into a written Agreement with the City and furnish a Payment Bond and Performance Bond in an amount equal to the Contract Price. The Material and Workmanship Bond shall be in an amount equal to ten percent (10%) of the Contract Price as adjusted on the Final Application for Payment. The Bidder will forfeit their Bid Security if they fail to do so. All Bonds shall be secured from or countersigned by an agency or surety company recognized in good standing and authorized to do business in the State of Florida. Allsubmittals will be evaluated by City staff in accordance with the criteria set forth in the bid documents. The City reserves the right to reject all bids/submittals, and to solicit and re-advertise for new bids, or to abandon the project in its entirety at any time during the process including, but not limited to, after the Notice of Intent to Award.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents