Similar Projects
2022 50/50 Sidewalk Repairs
Infrastructure
Bidding
$300,000 est. value
Wyomissing, PA

Watershed Restoration and Protection Program Grant - Krafczek Streambank Restoration
Infrastructure
Bidding
$300,000 est. value
Mount Penn, PA 19606

Merkle Road and Dogwood Drive Culvert Project
Infrastructure
Post-Bid
Boyertown, PA

Oley Furnace Road Drainage Project
Infrastructure
Post-Bid
Fleetwood, PA

State Game Lands #183 Shooting Range Improvements
Results
Palmyra, PA

Streambank Restoration
Results
Reading, PA

Retaining Block Wall - Berks County
Infrastructure
Post-Bid
PA

Phase 1 of the North Hill Road Improvements Project
Results
Robesonia, PA 19506

Antietam Creek Streambank Stabilization Project
Infrastructure
Post-Bid
Reading, PA 19606

15 Hampshire Road Culvert Replacement Project
Results
Reading, PA 19608

Bertolet Mill Road Culvert Replacement Project
Infrastructure
Post-Bid
Oley, PA

Toad Creek Improvements - Phase II
Results
Topton, PA

Blackberry Culvert Replacement Project
Infrastructure
Post-Bid
Boyertown, PA 19512

Chesapeake Bay Watershed Pollution Reduction
Infrastructure
Results

Marion Township Culvert Replacements
Infrastructure
Post-Bid
Womelsdorf, PA 19567

Last Updated 07/13/2022 02:46 AM
Project Title

Fritztown Stacked Rock - Streambank Protection

Physical Address View project details and contacts
City, State (County) Sinking Spring, PA 19608   (Berks County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $55,000 to $65,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The primary scope of work for this project includes stabilizing 120 ft. of streambank on the Cacoosing Creek that is in close proximity to a commercial structure. The streambank protection includes s 5'-8' stacked rock wall and removing failed concrete from previous building foundation protective measures. The scope of work also includes extension of rain downspouts, erosion & sediment control, grading & backfilling, and site stabilization (seeding, e&s matting, straw mulch, etc.).

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents