Similar Projects
Water Main Extension Project
Infrastructure
Bidding
$600,000 est. value
Godwin, NC

MOTSU Firefighting Water System
New Construction, Infrastructure
Bidding
$10,000,000 to $25,000,000 est. value
Southport, NC

2020 Street, Drainage, Water and Sewer Improvements
Post-Bid
$630,000 to $730,000 est. value
Dunn, NC 28334

2021 Water Main Replacement Project
Post-Bid
Cary, NC

Design Build Services for a 24-Inch Water Main Extension
Results
Less than $7,267,250 est. value
Concord, NC 28026

2018 Water System Improvements
Results
Less than $1,013,675 est. value
Roper, NC 27970

Replace All Potable Water Lines on First Floor B-4201
Infrastructure
Bidding
$100,000 to $250,000 est. value
Cherry Point, NC 28533

Stallings Road Water Improvements 2020
Post-Bid
Monroe, NC

16" Deep Raw Water Main Upgrade - Southern Outer Banks Water System
Results
Less than $450,000 est. value
Currituck, NC 27929

Water and Sewer Rehabilitation - Division 1
Infrastructure
Bidding
$500,000 est. value
Princeton, NC

FY 2018 CDBG15-I-3047 Water System Improvements Phase II
Post-Bid
Plymouth, NC

2020 Water Improvements Projects Contract Number 270 - Standby Power Systems
Results
Goldsboro, NC 27530

Wastewater Flow Meter Calibration Services
Post-Bid
Gastonia, NC

Haywood Road Waterline Improvements
Results
Pittsboro, NC 27312

385 West Transmission Improvements
Post-Bid
$600,000 est. value
Clayton, Smithfield, NC 27520

Last Updated 07/04/2022 12:54 AM
Project Title

Arrowhead Park Watermain Interconnection

Physical Address View project details and contacts
City, State (County) Wilmington, NC 28412   (New Hanover County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $725,000 to $735,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Wilmington, North Carolina. Completed plans call for site work for a water / sewer project. Arrowhead Park Watermain Interconnection Engineer's Opinion of Probable Construction Cost: $725,000 - $735,000. All inquiries concerning this bid shall be directed to CFPUA Purchasing Division by e-mail to bids@cfpua.org

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents