Last Updated | 04/06/2023 02:28 PM |
Project Title | Regional Water Reclamation Facility Expansion Project |
Physical Address | View project details and contacts |
City, State (County) | Lake Elsinore, CA 92530 (Riverside County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Bidding, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $170,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The existing Regional Water Reclamation Facility (RWRF) is an extended aeration, California Title 22 wastewater treatment facility designed for nitrification/denitrification and phosphorus removal. The current plant capacity is 8.0 mgd (annual average flow) and can support 17.6 mgd during peak wet weather flow events. The RWRF consists of two liquid treatment trains (designated as Train A & Train B) with combined solids dewatering. New construction includes construction of new fine screen facility, two aereation basins, membrane bioreactor (MBR) facility, UV dsinfection facility, Beltpress Building, Maintenance Workshop Building, ,Train A filter feed pump station, and improvements to the 51-inch influent bypass manhole. Other work includes modifications and expansion of the influent pump station, headworks, odor control facility, and modifications to dewatering area, Train B Filter actuators replacement, Operations Building modifications, replacement of Train A RAS/WAS pump station valves and piping, replacement of control panels at the scum pump stations for Train A clarifiers, and improvements to the Train B Filters including media replacement. The modifications to the Operations Building include upgrades to the HVAC system, relocation of the microbiology lab, and modifications to office space, kitchen/breakroom upgrades, and security improvements. Engineer's Estimated Cost: $140,000,000 to $150,000,000 Addendum #1-#7 have been issued as of 3-16-2023. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Project Contact: KELIA JONES Elsinore Valley Municipal Water District 31315 Chaney Street PO Box 3000 Lake Elsinore, CA 92530 Tel:(951) 674-3146 x8272 Fax:(951) 674-7554 kjones@evmwd.net Project Duration: 1,095 Calendar Days Liquidated Damages: $15,000.00 Per Calendar Day Bid Bond Percentage: 10% License Type Required: A Note from Shimmick Construction: subcontractors must fill out a form and return to Shimmick by 3-17-2023 at Noon contact Shimmick for further details Online Q&A Yes Q&A Deadline 03/10/2023 10:00 AM (PST) Contact Information |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |