Similar Projects
Reported | 07/13/2022 12:51 PM |
Project Title | Canterbury Drive/Elm Ridge Drive/Wood Drive/Woodland Drive - Willow Creek Subdivision, Phase II - Village Of Northbrook |
Physical Address | View project details and contacts |
City, State (County) | Northbrook, IL (Cook County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Paving/Reconstruction, Site Development, Storm/Sewers, Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Conceptual Design, Construction Start Expected February 2023 |
Bids Due | View project details and contacts |
Estimated Value | $4,375,701 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Site work and paving for a civil project in Northbrook, Illinois. Conceptual plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project. Since its annexation in 1964, the Village has maintained the Willow Creek Subdivision roadways according to Cook County's development requirements. The scheduled work includes resurfacing roadways and replacing existing curb. The roadways selected for the FY 2022/2023 asphalt reconstruction and rehabilitation program are rated as poor or having many failures. Roadways rated as poor (1 on a scale of 5) are significantly compromised and have potholes and/or alligator cracking and will quickly deteriorate. Roadways rated as having many failures (2 on a scale of 5) have large potholes and signs of the base beginning to fail will become evident. Examples of these failures include alligator cracking and failure of the roadway surface. This year's asphalt street reconstruction and rehabilitation project coincides with the planned water main replacement and storm water project in the area. The condition of the roads listed above is such that patching is no longer an option and asphalt rehabilitation and reconstruction is necessary. The roads selected for this year's program are based on staff and IMS ratings. Staff utilizes IMS, a pavement management system, to estimate costs for rehabilitation or reconstruction of each segment of asphalt street. IMS considers many variables, including square yards of pavement, when estimating costs; therefore, segments with similar yardage may have different cost estimates. As of July 12, 2022, this project is included in the city's 2023-2027 Capital Improvement Plan (CIP). Further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. |
||||||||||||
Details |
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |