Similar Projects
Hanover Southgate Mixed Use
New Construction, Infrastructure
Conception
$85,000,000 CJ est. value
Grand Prairie, TX 75050

Mockingbird Lane Office Development
New Construction, Infrastructure - 150,000 SF
Design
$32,000,000 CJ est. value
Dallas, TX 75235

Maple Avenue Apartments
New Construction, Infrastructure
Design
$3,600,000 CJ est. value
Dallas, TX 75235

Judge Charles R. Rose Community Park Phase 1
New Construction, Infrastructure - 260,360 SF
Sub-Bidding
$3,000,000 CJ est. value
Dallas, TX 75241

Carbon Pump Station Reconstruction
Demolition, New Construction, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Irving, TX 75038

Replacement of Fire Station 41
New Construction, Infrastructure - 8,248 SF
Post-Bid
$4,208,000 CJ est. value
Dallas, TX 75230

World-Wide Water Storage Tank Remediation
Term Contract
Results

Lake Highlands Trail Phase II - A and B and Lake Highlands Northern Extension - Site Development
Infrastructure
Results
$4,392,297 est. value
Dallas, TX

Irving Mall Site Work
Renovation - 767,000 SF
Construction
Irving, TX 75062

Salad and Go - Marsh & Walnut Hill / Dallas
New Construction, Infrastructure - 767 SF
Construction
$300,000 CJ est. value
Dallas, TX 75229

Huntington Townhomes
Demolition, New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Richardson, TX 75080

Haven at Waterview / Richardson
New Construction, Infrastructure - 300,212 SF
Pending Verification
$90,000,000 CJ est. value
Richardson, TX 75081

City Jail Expansion and Upgrades - City of Carrollton
Addition, Demolition, Renovation, Infrastructure
Design
$2,400,000 CJ est. value
Carrollton, TX 75006

Rebuild Chlorine Room at North Main Elevated Storage Tank
Renovation
Post-Bid
$135,000 to $140,000 est. value
Duncanville, TX

Copper Ridge Elevated Storage Tank Rehabilitation
Infrastructure
Results
$1,800,000 est. value
Richardson, TX 75080

Last Updated 11/11/2022 06:09 AM
Project Title

Richardson 825 Pressure Zone - Package 2 - 5.0 MG Ground Storage Tank

Physical Address View project details and contacts
City, State (County) Richardson, TX 75081   (Dallas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

The construction of Water Improvements to Expand the 825 Pressure Zone Capacity of the Citys Water Distribution System includes the Northside II Pump Station Expansion, Ground Storage Tank, City of Richardson Water Line, NTMWD Metering Station and Water Transmission Line. The expansion to 15 MGD has been commissioned to provide increased potable water needs associated with new development and growing demands. A new 5 MG Ground Storage Tank will be constructed adjacent to the Existing Northside Facility. Approximately 6,500 linear feet (LF) 30-inch, 2,100 LF of 20-inch, and 2,100 LF of 12-inch waterline along Renner Road, generally from Northside Pump Station (Pump Station) to Alma Road and along Alma Road from Renner Road to just south of President George Bush Turnpike (PGBT). The purpose of the water line is to facilitate moving the service area north of Renner Road and west of Alma Road (Service Area) from the 767 East Pressure Zone (767 EPZ) to the 825 Pressure Zone (825 PZ) and includes the following: Connection to 825PZ at the Pump Station. Multiple connections to the Service Area with the new pipeline as identified by the City. Maintain connectivity between 767 EPZ and 825 PZ. Maintain operation of the existing Booter Station west of Custer Road. A new North Texas Municipal Water District Metering Station and Water Transmission Line will be installed at the NSPS Site and along Renner Road from the NSPS to Custer Road to provide additional capacity to COR water system. Archer Western Construction, LLC (AW) and the City of Richardson, TX are requesting proposals from qualified, responsible companies for the Richardson 825 Pressure Zone CMAR project. AW and City of Richardson, TX reserve the right to accept or reject any and all responses at its option and to waive any formalities.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents