Similar Projects
RFQ D/B - CUVA 224822 Stabilize Cuyahoga Riverbank at High
Alteration
Bidding
$15,500,000 est. value
Akron, Cleveland, Independence, OH 44131

King Drive Culvert Replacement
Infrastructure
Bidding
$71,186 est. value
Green, Uniontown, OH 44685

Culvert Cleanout Services
Infrastructure
Post-Bid
Akron, Ashland, Bowling Green, Chillicothe, Delaware, Garfield Heights, Jacksontown, Lebanon, Lima, Marietta, New Philadelphia, Sidney, OH

Jacking and Boring Services
Infrastructure
Post-Bid

Reventment Bags and Erosion Control Mats
Results

ADS, Hancor, Haviland and Baughman Name Brand Plastic Tubing, Pipe and Fittings
Results

Box Culverts
Infrastructure
Post-Bid

Waterloo Road Brewster Creek Culvert Replacement
Results
Less than $1,476,491 est. value
Akron, OH

Concrete Pipes
Infrastructure
Post-Bid

2021 Concrete and Catch Basin Replacement Program
Results
Hudson, OH

Concrete Pipes
Infrastructure
Post-Bid

Miscellaneous - SUM-IR 77-31.97
Results
OH

Summit County Culvert Replacement and Maintenance Program
Results
$337,872 est. value
Akron, OH

2021 East Idlewood Culvert Repair
Results
$125,000 est. value
Twinsburg, OH

Sand Run Tributary Slope and Channel Stabilization
Results
Akron, OH

Last Updated 05/27/2022 12:30 PM
Project Title

Cuyahoga River Bank Stabilization Project

Physical Address View project details and contacts
City, State (County) Cuyahoga Falls, OH   (Summit County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $364,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Clearing And Grubbing Ls 1 Excavation Cy 433 Embankment (Compacted Granular Fill) Cy 34 Rock Bank Stabilization Cy 630 Rock Trench Key Cy 20 Water Diversion Plan Ls 1 Toe Rock Trench - Not Including Rock Excavation Cy 231 Conduit Repair Ls 1 Topsoil Cy 19 Seeding And Mulching (Odot Class 3b) Sy 400 Erosion Control Mat (Odot Types C) Sy 95 Erosion Control Mat (Odot Types F) Sy 305 Stormwater Pollution Prevention Plan Ls 1 Erosion And Sediment Control Management And Implementation Ls 1 Live Stakes, Complete Each 190 Site Access And Haul Road (Excavation And Site Restoration) Ls 1 Maintenance Of Traffic Ls 1 Construction Stakes And Surveying Ls 1 Mobilization Ls 1 Misc.: Pre-construction Video Taping Ls 1 As-built Drawings Ls 1 Toe Rock Trench - Bedrock Allowance Ls 1 Pavement Restoration Allowance Ls 1 10% General Contigency Allowance Ls 1

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents