Similar Projects
Installation of Student Lockers at Wayland Middle School
Alteration
Bidding
$230,000 est. value
Wayland, MA 01778

South Worcester Neighborhood Center Interior Renovations / DPWP
Alteration
Bidding
$120,000 est. value
Worcester, MA 01603

Tsongas HVAC Units Replacement - Sub Bid
Alteration
Sub-Bidding
$7,450,000 est. value
Lowell, MA 01852

Automotive Spray Booth Replacement Project - Sub-Contractor
Alteration
Sub-Bidding
Billerica, MA 01821

Biological Safety Cabinets, Cleaning, Certification, Maintenance, Repair and Installation
Post-Bid
Amherst, MA

Removal and Disposal of Existing Metal Lockers and Install New Heavy Duty Metal Corridor Lockers
Post-Bid
Dorchester, MA

Bathroom Renovations at Lathrop Village
Results
$79,000 est. value
South Hadley, MA 01075

Renovation of Middle School Cafeteria Bathrooms
Results
Less than $175,000 est. value
Watertown, MA 02472

Replacement of Damaged Handrail at City Hall
Alteration
Bidding
$30,000 est. value
Fitchburg, MA 01420

Purchase of Cabinets for Ten Apartments
Post-Bid
$29,000 est. value
Turners Falls, MA

Crocker Hall Stairway Improvements
Results
Less than $55,000 est. value
Framingham, MA 01702

Supply and Install Furniture, Fixtures and Equipment to Newton Early Childhood Program
Alteration
Bidding
$400,000 est. value
Newton, MA

Moakley Courthouse Paint and Carpet - 8th, 9th, and 10th Floors
Post-Bid
Boston, MA 02210

CCCC Frank and Maureen Wilkens Science and Engineering Center - Sub-Bids
New Construction - 39,000 SF
Results
Less than $28,765 est. value
Barnstable, MA 02668

Roll-In Shower Conversion
Post-Bid
Less than $30,000 est. value
Boston, MA 02130

Last Updated 06/07/2022 11:46 PM
Project Title

Bathroom Tubs

Physical Address View project details and contacts
City, State (County) Brewster, MA 02631   (Barnstable County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $140,009
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certification Required. Removal and disposal of all original cast iron tubs throughout development, replace waste and overflow assemblies, replace shower valves, provide new tub surrounds and repair/paint drywall to match existing in affected areas.

Details

Division 02 - Existing Conditions, Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Plastic Fabrications.
Division 09 - Finishes, Gypsum Plastering, Resilient Flooring, Painting.
Division 22 - Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents