Similar Projects
Autoliv AOA Pump House Addition
Addition - 425 SF
Post-Bid
Ogden, UT 84401

2019 Payson City Spring Lake Pump House Modifications
Post-Bid
Payson, UT 84651

DBB Replace POL Pump House Hill AFB Utah
Results
$10,000,000 to $25,000,000 est. value
Ogden, UT 84056

Otts Canyon Livestock Pipeline
Results
Vernon, UT

Laketown Water Improvements Project
Construction
Laketown, UT

Virgin River Pumphouse Renovation
Renovation
Post-Bid
$200,000 to $500,000 est. value
Saint George, UT

DFCM Construction - DOC USCF Off-Site Infrastructure Improvements
Results
Less than $70,000,000 est. value
Salt Lake City, UT

Elk Ridge Oak Lane Booster Pump Station
Post-Bid
Elk Ridge, UT 84651

Little Valley Pump Station Reconstruction
Results
Saint George, UT

Sandy City Well and Pump Station Maintenance Services (2020/21)
Post-Bid
Sandy, UT 84070

TM Boulevard Pump Station and Fox Canyon Pump Station
Results
Less than $1,000,000 est. value
Lehi, UT

Washington Dam Outfall and East Lift Station
Post-Bid
Washington, UT 84780

Jordan River Reservoir Pumping Facility
Results
Less than $425,500 est. value
Lehi, UT

2020 400 North Booster Station Project
Post-Bid
Less than $31,600 est. value
Bountiful, UT

Welby Jacob Canal Pump Station Project
Results
Less than $404,371 est. value
Bluffdale, UT

Last Updated 02/18/2019 08:08 PM
Project Title

MP-12D - 700 South Pump Station

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $17,200,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Construction of MP-12D - 700 South Pump Station in Salt Lake City. The pump station lifts wastewater from the Northwest Quadrant and the 4700 West Diversion into the 700 South Collect or sewer. Recent development changes in the service area, including the Utah State Prison, International Airport Expansion and land use plan changes to the Northwest Quadrant will cause wast ewater flows to the lift station to quickly exceed its available capacity
Details
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents