Last Updated 04/20/2020 04:29 PM
Project Title

Merkey Road 2020 Resurfacing

Physical Address View project details and contacts
City, State (County) Bear Lake, MI   (Manistee County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Location: The project is on Merkey Road, from 110’ west of the centerline of Cherry Road (POB = Station 8+90) easterly to 92’ west of the centerline of Maple Street (POE = Station 48+80). The project length is 0.76 miles Description of Work: The work at this location involves 0.76 miles of Hot Mix Asphalt (HMA) wedging and overlay, trenching and construction of proposed HMA and aggregate shoulders, approach paving, and maintaining traffic.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents