Similar Projects
Provide and Install Generator at Meadow Waste Water Station
Renovation
Sub-Bidding
$200,000 CJ est. value
Lee, MA 01238

Electrical Repair Services Water and Sewage
Term Contract
Sub-Bidding
$300,000 CJ est. value
Gloucester, MA 01930

Electrical, Instrumentation and Controls, Maintenance and Implementation Services
Post-Bid
Agawam, MA

Five Out of Six Schools Need to Upgrade Their Network Wiring
Post-Bid
Randolph, MA

New Electrical Service
Results
Less than $848,000 est. value
Worcester, MA

Maintenance and Repairs of Energy Management Systems
Results
Less than $150,000 est. value
Worcester, MA 01605

On Call Electrical Services
Term Contract
Sub-Bidding
Salem, MA 01970

SSA-Lighting Upgrades at Multiple Buildings
Post-Bid
$2,500,000 est. value
Salem, MA

Video Surveillance Equipment Service and Upgrades at Various Locations
Results
$200,000 est. value
Cambridge, MA

Conduit Installation at Northeastern Correctional Center
Renovation
Sub-Bidding
$350,000 CJ est. value
Concord, MA 01742

UPS Battery Replacement
Post-Bid
Boston, MA

Modifications to Back Up Generator Control System - Walter J. Sullivan Water Treatment Plant
Results
$67,813 est. value
Cambridge, MA 02138

Cooper Recloser 23KV Class
Term Contract
Sub-Bidding
Westfield, MA 01085

Padmount Transformers
Post-Bid
Shrewsbury, MA

On-Call Electrician
Term Contract
Results
$10,763 est. value
Longmeadow, MA

Last Updated 08/19/2022 03:09 PM
Project Title

Chilmark Community Center Generator Replacement

Physical Address View project details and contacts
City, State (County) Chilmark, MA 02535   (Dukes County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

CHILMARK is seeking quotes for the replacement of the Kohler 20Kw backup generator at the Community Center, 520 South Road. We are requesting a propane fired 24Kw generator, equal to or better than an air-cooled Generac 24KW, that is suitable for use at the community emergency shelter with run time of no less than 72 hours continuous load. This installation quote shall be all inclusive of any and all services necessary to provide a "turn-key" solution. The generator should be available for installation within 30 days of acceptance of the quote. This site has a Photovoltaic array on the roof that produces electricity using AC micro-inverters. A future whole building battery back-up (ie. Tesla/enPhase/GeneracPWRcell) is planned and this installation should take those installation needs into consideration. The method of Contractor Selection has not been Determined at this time.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents