Similar Projects
Burkholder Blvd - Warm Springs To Russell, Phase 2 - ST093 - City Of Henderson
Infrastructure
Conception
$6,600,000 CJ est. value
Henderson, NV 89015

Burkholder Blvd - Warm Springs To Russell, Phase 2 - ST093 - City Of Henderson
Infrastructure
Conception
$6,600,000 CJ est. value
Henderson, NV 89015

AutoZone #2208 / Las Vegas
New Construction, Infrastructure - 7,700 SF
Design
$1,500,000 CJ est. value
Las Vegas, NV 89115

North 5th Street - Cheyenne Avenue to Lone Mountain Road - 10517 - City of North Las Vegas
Infrastructure
Design
$6,375,000 CJ est. value
North Las Vegas, NV 89081

Replace Domestic Water and Sanitary Sewer Northern Nevada Correctional Center
Infrastructure, Renovation
Bidding
$28,088,340 CJ est. value
Carson City, NV 89701

Replace Domestic Water and Sanitary Sewer Northern Nevada Correctional Center
Infrastructure, Renovation
Bidding
$28,088,340 CJ est. value
Carson City, NV 89701

Football Scoreboard at Spanish Springs High School
Infrastructure
Sub-Bidding
$155,000 CJ est. value
Sparks, NV 89441

Muller Parkway Improvement Project
Post-Bid
$9,400,000 est. value
NV

Blagg Road Overlay and Widening
Infrastructure
Post-Bid
Pahrump, NV 89060

Pavement Replacement Services 2020-2022 - Large Row Site Locations
Results
Less than $1,997,250 est. value
Las Vegas, NV

Lander County 2021 Preventative Maintenance Gillman and Kingston Capeseal Project
Results
Battle Mountain, NV

Construct Organizational Parking Addition Las Vegas Readiness Center
Addition, Demolition, Infrastructure
Construction
$1,564,023 CJ est. value
Las Vegas, NV 89139

Construct Organizational Parking Addition Las Vegas Readiness Center
Addition, Demolition, Infrastructure
Construction
$1,564,023 CJ est. value
Las Vegas, NV 89139

Chabad of Green Valley
New Construction, Infrastructure - 14,853 SF
Pending Verification
$4,000,000 CJ est. value
Henderson, NV 89052

Chabad of Green Valley
New Construction, Infrastructure - 14,853 SF
Pending Verification
$4,000,000 CJ est. value
Henderson, NV 89052

Last Updated 08/05/2022 02:33 AM
Project Title

Timber Creek Horse Camp Reconstruction

Physical Address View project details and contacts
City, State (County) Ely, NV 89301   (White Pine County)
Category(s) Entertainment/Recreation, Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Misc. Recreational, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

1. This is a complete copy. Information and instructions for submission of proposals as well as contract provisions and specifications are contained in this OFFEROR REFERENCE COPY. This copy should be retained by offerors. 2. Note: An offer guarantee (Bid Bond) IS REQUIRED. Performance and Payment Bonds will be required of the successful offeror. (See Section I, FAR Clause 52.228-15.) 3. All questions regarding this solicitation must be in writing and addressed to the Contracting Officer email Tanya Spanfellner, tanya.spanfellner@usda.gov All questions must be received no later than JULY 1,2022 by 1630 MT to be considered prior to solicitation close date. SITE VISIT JUNE 29, 2022 at 1400 PT, Meet at Project Location, White Pine County, NV, in Section 26, T 18 N, R 65 E. It is located approximately 29 miles northeast of Ely, NV. The project may be accessed from US Highway 93, Duck Creek Road, and Forest Road 425 (Timber Creek Road). AT A MINIMUM, OFFEROR SHALL SUBMIT THE FOLLOWING DOCUMENTS BACK WITH THEIR RESPONSE TO THIS SOLICITATION: 1. SF-1442, Complete, date, and sign. Provide UNIQUE ENTITY IDENTIFER and email address. Block 14 2. Representations and Certifications Section K 52.204-8. You must complete Representations and Certifications via SAM, please only submit a response to Paragraph (b)(1) Pg. 31. 3. Provide information required Section L Addenda to FAR clause 52.215-1, paragraph c, Page 40-41 4. Fill out the pricing schedule for all items Section B-Schedule, Page 6-9 5. Provide Liability insurance verification 6. Complete Determination of responsibility, Attach 4 7. Submit Bid Guarantee 52.228-1-20% of your price PROPOSALS ARE DUE JULY 12, 2022 BY 1630 MT Return to: NAME: TANYA SPANFELLNER Email: tanya.spanfellner@usda.gov Solicitation No. 1240LT22R0075 ONLY EMAIL PROPOSALS ARE BEING ACCPETED Please keep a copy of your quote for your records. NO PAPER SOLICITATIONS SHALL BE ISSUED. IT IS THE OFFERORS RESPONSIBILITY TO WATCH FOR ANY AND ALL AMENDMENTS TO THE SOLICITATION *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Selective Clearing, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents