Similar Projects
Base Bid:2 San Sewer Manholes
Infrastructure
Bidding
$1,200,000 est. value
Orange, MA

New Sewerage Collection and Disposal System
Infrastructure
Post-Bid
$900,000 est. value
Charlemont, MA

West Street Improvements - Phase 2
Infrastructure
Post-Bid
Greenfield, MA 01301

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Greenfield Road Water Main
Results
$940,000 est. value
Deerfield, MA

100 Feet. of 2 Water Lines and 6 Sewer Lines are to be Trenched and Installed
Infrastructure
Post-Bid
$300,000 est. value
Montague, MA

West Street Improvements - Phase 1
Results
$665,125 est. value
Greenfield, MA

Arch Street Sewer Force Main Replacement
Results
$1,250,000 est. value
Erving, MA 01344

East Leverett Road Water Main
Results
$1,382,775 est. value
Leverett, MA

Scheduled and Emergency Drainage Structure and Pipe Cleaning at Various Locations
Infrastructure
Results
$89,225 est. value

Old Deerfield Sewer Rehabilitation Phase 1 Project
Infrastructure
Results
$72,000 est. value
South Deerfield, MA

Old Deerfield Sewer Replacement Phase 1 Project
Infrastructure
Results
$189,000 est. value
South Deerfield, MA

Northfield Sewer District Collection System Rehabilitation
Infrastructure
Results
$100,000 est. value
Northfield, MA

Eastern Avenue Water Main Replacement
Infrastructure
Results
$450,000 est. value
Deerfield, South Deerfield, MA 01373

Graves Street Water Main Replacement
Infrastructure
Results
$225,000 est. value
South Deerfield, MA

Reported 06/02/2022 12:00 AM
Project Title

North Main Street Water and Sewer Replacement Project

Physical Address View project details and contacts
City, State (County) Orange, MA 01364   (Franklin County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $2,329,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

North Main Street Water and Sewer Replacement Project. The work consists of the replacement of existing water mains and existing gravity sewer mains with new ductile iron and PVC pipe, respectively, along North Main Street from East/West Main Street to Lincoln Avenue. Included with this work is the replacement of water services, valves, and hydrants, as well as the replacement of gravity sewer services. Bids shall be on a unit price basis. This project is funded by loans from the Massachusetts Clean Water Trust/State Revolving Fund loan program.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents