Similar Projects
Sewer Replacement
Renovation, Infrastructure
Bidding
Rock Island, IL 61201

Roof, Railings, & Gutters
Renovation, Alteration
Bidding
Rock Island, IL 61201

Housing Rehabilitation Program - Siding, Soffit, Gutter (Pendelton)
Renovation
Post-Bid
Rock Island, IL 61201

Community Housing Services (CHS) Program
Renovation
Post-Bid
Moline, IL 61265

Housing Rehabilitation Program - Steps, Landing, and Lights - Spaulding
Renovation
Results
Rock Island, IL 61201

Housing Rehabilitation Program - Concrete, Steps, Electrical, And Hvac (Angel)
Renovation
Results
Rock Island, IL 61201

Habitat for Humanity Senior Rehab Program
Post-Bid
Moline, IL 61265

Housing Rehabilitation Program - Gutters, Downs, & Windows (Dominguez)
Renovation
Results
Rock Island, IL 61201

Illinois Affordable Housing Trust Fund Single Family (SFR), Round 2 (SFR-R) - Roof, Gutters
Renovation
Post-Bid
Moline, IL 61265

Housing Rehabilitation for General Contractor
Renovation
Results
Rock Island, IL 61201

Douglas Park Fire Station #5 - Restoration Phase One
Renovation, Alteration
Post-Bid
Rock Island, IL 61201

Single Family Rehabilitation Program
Results
Moline, IL 61265

Porch Build, Door, Window
Alteration
Post-Bid
Rock Island, IL 61201

Remodel & Repair at 904 43rd Street
Renovation
Results
Less than $25,000 est. value
Rock Island, IL 61201

New Roof, Tuck Point, and Chimney Removal
Renovation, Alteration
Post-Bid
Rock Island, IL 61201

Last Updated 04/20/2022 03:50 PM
Project Title

Siding & Side Door

Physical Address View project details and contacts
City, State (County) Rock Island, IL 61201   (Rock Island County)
Category(s) Residential, Single Trades
Sub-Category(s) Single-Family Homes, Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Project has recently been cleared of LBP hazards. Windows have been replaced and encapsulated. Soffits and facia are new and shall be left untouched. This second phase of the project will need a side entry door removed and replaced with new pre-hung man door. It will require new deadbolt and lockset keyed alike. Encapsulate the brickmold and exterior jamb with white break metal. Install fan fold and tape seams through out the entire exterior. The existing siding is transite and is in good shape, so contractor will make the determination if the need to remove before installing new siding. If old material needs to be removed this must be broken out in the bid to reflect additional cost up front. New siding specks will be double 4” vinyl siding panels. Homeowner shall select the colors given from contractor’s color samples. Providing nothing is a special-order or discontinued colors and manufactured product. This work will need building permit and inspections.

Details

Single-Family Homes, Renovation.
Division 07 - Thermal and Moisture Protection, Siding.
Division 08 - Openings, Doors and Frames.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents