Similar Projects
HVAC Preventative Maintenance Services
Term Contract
Post-Bid
Newmarket, NH

Weatherization and Home Energy Assistance Services
Post-Bid
Merrimack, NH

Lebanon Airport Terminal HVAC Improvements
Results
$230,000 to $250,000 est. value
Lebanon, NH 03784

HVAC Drives
Results
Newington, NH 03308

Replacement of Air Handlers and Computer Units
Post-Bid
Nashua, NH 03060

J--Plumbing and Pipefitting Services BOA
Results
West Haven, CT - Bedford, Boston, Leeds, MA - Augusta, ME - Manchester, NH - Providence, RI - White River Jct, VT

Unit Heater Replacement - 2021
Term Contract
Post-Bid
Seabrook, NH 03874

Repair HVAC Unit, Londonderry, New Hampshire
Results
Londonderry, NH

Thermal Remediation of Volatile Organic Compounds Project
Post-Bid
Salem, NH 03079

Refrigeration System
Results
Hanover, NH 03755

HVAC Maintenance and Repair Services
Term Contract
Post-Bid
Concord, NH

HVAC Repairs and Boiler Preventative Maintenance
Results
Concord, NH 03301

2021 Heating and Plumbing System Contract
Post-Bid
Lebanon, NH

HVAC Controls Replacement
Results
New Boston, NH 03070

LPD Mini-Split Air Conditioning Project
Post-Bid
Laconia, NH 03246

Last Updated 05/19/2020 11:33 AM
Project Title

Plumbing and/or HVAC

Physical Address View project details and contacts
City, State (County) Jaffrey, NH 03452   (Cheshire County)
Category(s) Single Trades
Sub-Category(s) HVAC, Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plumbing and HVAC repair services for its school facilities. The Jaffrey-Rindge Cooperative School District does not represent that it will utilize the contractor’s services any guaranteed number of times over the course of the year. Contractor shall: 1. Provide services on an as-needed basis to all school facilities; 2. Be available 24 hours per day 7 days per week for emergency situations and respond promptly, but not later than one hour after receiving request for emergency services; 3. Be flexible in terms of scheduling non-emergency work to meet the needs of school schedules; 4. Provide maximum continuity of service personnel as possible; and 5. Supply all necessary tools and equipment to perform the work as requested.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents