Similar Projects
Repair Asphalt Roads and Parking Scott AFB
Alteration
Bidding
$500,000 to $1,000,000 est. value
Scott Air Force Base, IL

Hot-Mix Asphalt Pavement
Infrastructure
Bidding
Belleville, IL

Van Buren Street Resurfacing
Post-Bid
New Athens, IL 62264

Central Division - Asphalt Paving Maintenance
Post-Bid

Dawn Heights Road Improvements
Renovation
Results
Less than $579,829 est. value
Belleville, IL 62220

Road Patching at 3 Locations
Results

Pavement Widening, HMA and PCC Pavement, Storm Sewer, Curb and Gutter, Replace the Deck on the Structure over the Tributary to Richland Creek, Pipe Culverts, Guardrail, Pavement Markings, and Traffic Signal Improvements on Frank Scott Parkway from West of Old Collinsville Road to West of Green Mount Road
Infrastructure
Bidding
IL

Olivette Neighborhood Street Improvements - Phase 3
Post-Bid
Belleville, IL

Concrete Overlay, Patching, Deck Replacement and Expansion Joints on the Poplar Street Collector Distributor Ramps (SN 082-0144, 0255, 0203, 0256, 0140 and 0005)
Results
IL

Reconstruction of Shiloh Station Road From 0.4 Mile North of Johnson Road to 0.2 Mile North of Johnson Road in Shiloh
Infrastructure
Bidding
IL

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

Resurfacing, Curb and Gutter, and Sidewalk Replacement on Mousette Lane
Results
Cahokia, IL 62206

Aggregate
Post-Bid
Freeburg, IL

Presidential Street Improvement Phase V and West Presidential Street Improvements Phase 1
Results
O'Fallon, IL

Roadway Chip Seal
Alteration
Post-Bid
Belleville, IL

Last Updated 02/09/2022 02:44 PM
Project Title

2022 Street Resurfacing

Physical Address View project details and contacts
City, State (County) O'Fallon, IL 62269   (Saint Clair County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work consists of milling of existing surfaces, and applying a bituminous overlay. No less than the prevailing rate of wages, as determined in accordance with the Illinois Prevailing Wage Act, shall be paid to all laborers, operators, teamsters, masons, plumbers, and any workmen employed in construction on this project. Laverna Evans Parking Lot: this work consists of 1.5" bituminous surface removal, SS1-VH or NTEA tack coat and 1.5" N70 C Surface Course in driving lanes (2,500 SY).

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents