Last Updated 01/12/2022 07:34 AM
Project Title

Reconstruction/Rehabilitation - Fairfield CO

Physical Address View project details and contacts
City, State (County) SC   (Fairfield County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds and Insurance 1.000 Ls Traffic Control 1.000 Ls Railroad Insurance and Flagging 001 1.000 Ls Selected Clearing & Grubbing 1.000 Ls Removal & Disposal of Existing Pavement 325.000 Sy Removal & Disposal of Existing Curb 390.000 Lf Removal & Disposal of Existing Concrete 90.000 Cy Unclassified Excavation 2,734.000 Cy Borrow Excavation 554.000 Cy Station Grading 3.690 Sta Cement Modified Recycled Base (8" Unif)-curing Method B 11,832.000 Sy Cement Modified Recycled Base (10" Unif)-curing Method B 61,750.000 Sy Portland Cement for Cement Modified Recycled Base Course 2,483.000 Ton Maintenance Stone 382.000 Ton Hot Mix Asphalt Base Course - Type B 4,123.294 Ton Liquid Asphalt Binder Pg64-22 816.341 Ton Full Depth Asph. Pav. Patching 8" Unif 250.000 Sy Full Depth Asph. Pav. Patching 10"Unif 1,140.000 Sy Milling Existing Asphalt Pavement 2.0" 9,947.000 Sy Milling Existing Asphalt Pavement (Variable) 5,800.000 Sy Milled-in Rumble Strip 9.960 Mi Hot Mix Asphalt Surface Course Type C 7,371.390 Ton Hot Mix Asphalt Surface Course Type E 2,204.519 Ton Driveway Paving-surface Type C 366.625 Ton Asphalt Surface Treatment(Single Treatment) 73,582.000 Sy Permanent Construction Signs (Ground Mounted) 1,833.000 Sf Pavement Markings (Temporary Paint) 24"X36" White Triangle Yieldbar144.000 Lf 4" White Broken Lines -(Gaps Excluded)-fast Dry Paint 2,621.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-fast Dry Paint 162,046.000 Lf 6" White Solid Lines (Pvt. Edge Lines)-fast Dry Paint 1,800.000 Lf 8"White Solid Lines(Crosswalk&channelization)fast Dry Paint 200.000 Lf 24" White Solid Lines (Stop/diagonal Lines)-fast Dry Paint 1,050.000 Lf White Single Arrow (Left, Straight, Right)-fast Dry Paint 8.000 Ea White Word Message "Only"-fast Dry Paint 8.000 Ea Railroad Crossing Symbols - Fast Dry Paint 4.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 835.000 Lf 4"Yellow Solid Line(Pvt.edge&no Passing Zone)-fast Dry Paint 170,910.000 Lf 6" Yellow Solid Line on Curb/median - Fast Dry Paint 3,420.000 Lf 4" White Broken Lines(Gaps Excl.)thermoplastic- 90 Mil. 1,226.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 54,070.000 Lf 6" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 450.000 Lf 8" White Solid Lines Thermoplastic - 125 Mil. 200.000 Lf 24in X 36in White Triang. Yield Bar (Gaps Exc)thermo-125mil 72.000 Lf 24" White Solid Lines (Stop/diag Lines)-thermo.-125 Mil 565.000 Lf White Single Arrows (Lt, Strght, Rt) Thermo.-125 Mil. 4.000 Ea White Word Message "Only" -thermoplastic - 125 Mil. 4.000 Ea Railroad Crossing Symbols - Thermoplastic - 125 Mil. 2.000 Ea 4" Yellow Broken Lines(Gaps Exc)thermoplastic - 90 Mil. 835.000 Lf 4" Yellow Solid Lines(Pvt.edge Lines) Thermo-90 Mil. 60,062.000 Lf Permanent Clear Pavement Markers- Mono-dir.- 4"X4" 8.000 Ea Permanent Yellow Pavement Markers Bi-dir.- 4"X4" 382.000 Ea Removal of All Pavement Markings 2.300 Lm Furnish & Install 1.0" Schedule 80 Pvc Conduit 20.000 Lf Furnish & Instl No. 14 Copper Wire,1-conductor for Loop Wire 700.000 Lf Sawcut for Loop Detector 250.000 Lf Temporary Adjustment of Traffic Signal Equipment 1.000 Ea Catch Basin -type 9 1.000 Ea Catch Basin - Type 9(Top Only) 5.000 Ea Adjust Catch Basin 7.000 Ea Catch Basin T-17 (Convert C.b. Type 6) 1.000 Ea Concrete Curb (9" X 15") 500.000 Lf Concrete Curb and Gutter(1'-6") Vertical Face 75.000 Lf Concrete Curb and Gutter(2'-0") Vertical Face 240.000 Lf Concrete Curb and Gutter (2'-6") Vertical Face 75.000 Lf Concrete Sidewalk(4" Uniform) 112.000 Sy Detectable Warning Material 162.500 Sf Concrete Median 540.000 Sy Pedestrian Ramp Construction 325.000 Sy Surface Applied Detectable Warning 12.500 Sf Bituminous Curb 1,800.000 Lf Rip-rap (Class a) 30.000 Ton Geotextile Fabric for Erosion Control Under Riprap (Class 2) 25.000 Sy Remove & Dispose Semi-rigid Gr Device 1,951.000 Lf Mt3 Leading End Treatment Tl3 4.000 Ea Premash Thrie With Base Pl 3.125 Spacing 100.000 Lf Mgs3cs Gr Compressed Shoulder 1,000.000 Lf Premash Trailing W-beam Type B 12.5' 1.000 Ea Premash Thrie Strong Post Guardrail 100.000 Lf Premash W-beam Tight Curved System 12.500 Lf Premash Type T Tl3 Leading 50' 17.000 Ea Permanent Grassing for Non-permitted Resurfacing Projects 3.310 Acre Silt Fence 300.000 Lf Replace/repair Silt Fence 100.000 Lf Cleaning Silt Basins 4.000 Cy Removal of Silt Retained by Silt Fence 100.000 Lf Aggregate No.5 or 57 for Erosion Control 10.000 Ton

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents