Similar Projects
Transportation Building Bus Lift Demolition and Repairs
Demolition
Bidding
Bethlehem, PA 18017

Demolition Of Hazardous Structures
Bidding
$350,000 est. value
Scranton, PA 18507

PQ List for Demolition Services in CDBG
Post-Bid
Pittsburgh, PA 15219

CDBG Removal of Blighted Structures
Post-Bid
Berwick, PA 18603

Demolition of Two Story Residence and Vacant School Building
Demolition
Results
Johnstown, PA 15905

Modular Classroom and Church Demolition at the Ringgold Elementary School North
Demolition
Results
Finleyville, PA 15332

Asbestos Abatement, Demolition and Site Clearance
Bidding
Sharon Hill, PA 19079

Emergency Demolition 39 North 18th Street
Post-Bid
Harrisburg, PA 17101

City of Lock Haven Sewer Plant Demolition
Results
Lock Haven, PA 17745

P400--Project 529-22-100 Building #3 Demo D/B
Bidding
$250,000 to $500,000 est. value
Butler, PA 16001

Murphy Building Demolition Project
Demolition
Post-Bid
Blairsville, PA 15717

Removal of all Buildings and Foundations on the Property at 9694 SR 287
Demolition
Results
Wellsboro, PA 16901

2021 Schuylkill County Demolition Program
Demolition
Bidding
Pottsville, PA 17901

UST Removal and Soil Excavation at Lukoil Site # 69243
Renovation
Post-Bid
Glenside, PA 19038

Demolition of Three Buildings and Associated Items Located at 3030 Castor Avenue
Results
Philadelphia, PA 19122

Reported 01/20/2021 12:00 AM
Project Title

Administration Building Demolition

Physical Address View project details and contacts
City, State (County) Aliquippa, PA 15001   (Beaver County)
Category(s) Heavy and Highway
Sub-Category(s) Demolition
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work generally consists of the complete demolition and off-site disposal of an existing Administration/ Maintenance Building located along Hopewell Avenue adjacent to the Aliquippa Water Filtration Plant in Aliquippa. Demolition is to include complete removal of foundations including concrete basement/foundation walls and base. Work includes all labor, materials, equipment, hauling, disposal, etc. required to complete the demolition and disposal in accordance with all applicable regulations and all necessary appurtenances and restoration.

Details

Division 02 - Existing Conditions, Demolition.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents