Similar Projects
Franklin Street Multi Family
New Construction
Conception
$4,500,000 est. value
Salem, MA 01970

Springfield Civic Center Garage Replacement
Renovation
Conception
Springfield, MA 01103

East Milton Square Mixed Use
New Construction - 18,800 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Milton, MA 02186

218-220 Old Colony Avenue
New Construction - 39,179 SF
Design
$14,400,000 est. value
South Boston, MA

Four Corners Plaza
New Construction, Build-Out - 103,302 SF
Post-Bid
$13,500,000 est. value
Dorchester, MA

Belgrade Apartments
New Construction - 40,374 SF
Post-Bid
$7,000,000 to $7,500,000 est. value
West Roxbury, MA 02132

Forest Park Aquatic Garden Gazebo
Results
$120,000 est. value
Springfield, MA

Route 128 Parking Garage Repairs
Results
$15,000,000 est. value
Boston, MA

33-39 Ward Street
New Construction - 26,548 SF
Construction
$4,750,000 est. value
South Boston, MA 02127

Mattapan Station Redevelopment - Phase I
New Construction - 168,000 SF
Construction
$51,000,000 est. value
Boston, MA 02126

Hyde Park Avenue Residential Development
New Construction, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Boston, MA 02136

Soldiers Field Road Residential Development
New Construction, Infrastructure - 14,500 SF
Pending Verification
$198,000,000 CJ est. value
Boston, MA 02135

Inquilinos Boricuas En Accion Community Center
New Construction - 26,000 SF
Conception
Boston, MA 02118

Broadway Mixed Use
New Construction - 15,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Somerville, MA 02143

500 Talbot Mixed Use Development / Dorchester
New Construction - 49,500 SF
Post-Bid
$13,500,000 CJ est. value
Boston, MA 02124

Last Updated 09/07/2022 03:02 AM
Project Title

Garage and Gatehouse Siding and Door Replacement

Physical Address View project details and contacts
City, State (County) Uxbridge, MA 01569   (Worcester County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Parking Garage
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $51,500 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Award Details Contract Award Date: Sep 01, 2022 Contract Award Number: W912WJ22P0110 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: DUNFYF4JJB73 Contractor Awarded Name: JB Contracting, Inc. Contractor Awarded Address: Holden, MA 01520-2119 USA Base and All Options Value (Total Contract Value): $51500.00 THE WORK CONSISTS OF: Furnish all materials, equipment, and labor to remove and legally dispose of the existing vinyl siding, insulation, and underlayment, entry door, and garage door and install new building wrap system, flashing, vinyl siding system, garage door and entry door on the West Hill Dam Garage #5, as well as removing and disposing of existing steel entry door and installing new entry door and frame at the West Hill Dam Gatehouse for the purpose of facility maintenance. This procurement is set-aside for small business vendors. The applicable NAICS code is 238170 with a Small Business Size Standard of $16.5 Million. ALL OFFERORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED. ANY OFFEROR THAT DOES NOT HAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NON RESPONSIVE. MAGNITUDE OF PROJECT The estimated cost of the work is between $ 25,000 and $100,000 Statement of Work Furnish all materials, equipment, and labor to remove and legally dispose of the existing vinyl siding, insulation, and underlayment, entry door, and garage door and install new building wrap system, flashing, vinyl siding system, garage door and entry door on the West Hill Dam Garage #5, as well as removing and disposing of existing steel entry door and installing new entry door and frame at the West Hill Dam Gatehouse for the purpose of facility maintenance. Location The required services shall be performed at the following project site location: West Hill Dam, 518 Hartford Ave. East, Uxbridge, MA 01569 3. Site Visits Contact the Technical Point of Contact, Jason Monteiro 978-318-8312 or Jason.T.Monteiro@usace.army.mil to arrange a site visit. 4. Schedule The period of performance shall be 120 days from Contract award. Work shall commence within 15 days after Contract Award. The project area will be open to the contractor Monday through Friday 7:00 AM to 3:30 PM and all work must be done during those hours unless additional hours are approved by the Technical Point of Contact. No work shall be done on weekends or Government holidays. 5. Safety a) General: All work shall be conducted in accordance with the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1, most recent edition), and all applicable Occupational Safety and Health Administration (OSHA), federal, state, and local safety and W912WJ22Q0115 Page 5 of 48 health requirements. A copy of EM 385-1-1 can be accessed at the project office or electronically at the following link: http://www.publications.usace.army.mil/Portals/76/Publications/Engi neerManuals/EM_385- 1-1.pdf Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized. b) Abbreviated Accident Prevention Plan INSTRUCTIONS TO OFFERORS PLEASE DIRECT QUESTIONS TO FRED E. RILEY AT (978) 318-8256 OR FRED.E.RILEY@USACE.ARMY.MIL. THE SOLICITATION AND RESULTING CONTRACT SHALL BE THE GOVERNING DOCUMENT IN ALL CASES. ** QUOTES CAN BE E-MAILED TO FRED RILEY AT FRED.E.RILEY@USACE.ARMY.MIL. In accordance with FAR Part 52.204-7(b)(1) Contractors must be registered in the System for Award Management (SAM) database (www.SAM.gov) to submit an offer. (Formerly the Central Contractor Registration (CCR) database and the On-Line Representations and Certifications (ORCA).) Any reference to CCR or ORCA in any clause or provision is referring to the www.sam.gov website. Please note that Google and Google Chrome are not supported browsers for SAM registration. Mozilla FireFox, Safari, and Internet Explorer are supported browsers. NOTE: SAM.gov registration takes approximately 3 weeks (DUNS registration 1-2 business days; CAGE code validation up to 10 business days; IRS validation and overall submission 7-10 business days). It is the contractor's responsibility to track SAM.gov registration and follow-up with required tasks. In addition, if you are registering a new entity in SAM.gov, you must provide an original, signed notarized letter stating that you are the authorized Entity Administrator. The Entity Administrator must establish a LOGIN.GOV account using the e-mail address that will be associated with the SAM registration. See https://www.gsa.gov/aboutus/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/samupdate for additional information *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents