Last Updated | 11/22/2022 03:04 PM |
Project Title | Calvin T. Ryan Library - Bid Package 2 |
Physical Address | View project details and contacts |
City, State (County) | Kearney, NE 68849 (Buffalo County) |
Category(s) | Education, Government/Public |
Sub-Category(s) | College/University, Library - Public |
Contracting Method | Competitive Bids |
Project Status | All Bids Received, Results Expected, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $600,000 [brand] Estimate |
Plans Available from | Construction Manager |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | MCL Construction has been recently awarded the contract for UNK Calvin T. Ryan Library project. In conjunction with the construction team, DLR, and the University of Nebraska Kearney, MCL is inviting your firm to provide a proposal for the Bid Package #2 - GMP Set-Major Trades scope based on the information outlined below. It is MCLs intent to select the most qualified partner who will best fit the project team. Scope of Work Specification Sections Selective Demolition 024119 Temporary Walls-Framing & Drywall 054000 & 092900 Door, Frames & Hardware 0811113 & 081416 Fire Suppression-RFPs GMP Division 21(all) Mechanical-RFPs GMP Division 22 & 23 Electrical-RFPs GMP Division 26, 27 & 28 Your proposal should include a Complete package to meet the intended design as outlined below and depicted in the drawings, specifications, and all supplemental documents provided. Please clarify any assumptions that you make while preparing your proposal. Your company will be contractually tied to your bid amount barring any major scope changes. This project is tax-exempt and will require a supply bond. Requirements for Major Trade RFPs are outlined in attached 3.1 Major Trade RFP Letter for respective scope of works. MCL is finalizing BP #1 Early Equipment for AHUs, Switchgear, Transformer & Generator. This information will be provided as soon as available for coordination and inclusion for Major Trade GMP proposals. All warranties, shipping details, shipping dates, unloading and controls information for equipment will be assigned and awarded Major trade need to be transferred to them. The rest of the scopes of work will be released for bidding when we receive the final construction documents. In the meantime, MCL would greatly appreciate budget proposals from all other scopes not listed above All inquiries regarding this project should be made to Trever Roberts at MCL Construction, Inc. by email at tlr@mclconstruction.com Bidder Questions Due: Friday November 11, 2022 Anticipated Award: December 23rd, 2022 |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |