Similar Projects
Multi-Discipline Architect-Engineer Services
Design
$10,000,000 to $20,000,000 est. value
Aurora, Colorado Springs, CO - New Boston, NH - Socorro, NM

A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Local Hazard Mitigation Plan Update
Infrastructure
Bidding
Westminster, CO

Water Drainage Study for Trailside Subdivision
Infrastructure
Bidding
Westminster, CO 80031

Engineering, Planning and Development
Post-Bid

Architect-Engineering (AE) Indefinite Delivery Contract (IDC) in Support of the Defense Health Agency (DHA) and Component Medical Commands
Post-Bid
Less than $45,000,000 est. value
Washington, DC

Highway and/or Bridge Design and Engineering Services
Results
Less than $80,000,000 est. value

Water Tank Inspections, OCONUS and CONUS
Results
$10,000 to $5,000,000 est. value

Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

Engineering - Professional Engineering Services for Brighton Road and 84th Avenue
Infrastructure
Bidding
$500,000 est. value
Derby, CO 80022

Job Order Engineering Services for Transportation and Traffic Services
Term Contract
Post-Bid
$10,000 to $400,000 est. value
Aurora, CO

Engineering Services for the 2021 PRV Vault Improvement Project and 2021 Water Vault Rehabilitation Project
Results
Aurora, CO 80012

Construction Oversight or Owners Representative
New Construction, Alteration
Design
$17,600,000 est. value
Aurora, CO 80010

RFP Engineering - Phase I of the North Complex Hazeltine Pump Station and Complex EI and C Project
New Construction, Infrastructure
Bidding
$720,000 est. value
Commerce City, CO 80640

Aquifer Storage and Recovery Feasibility Study
Post-Bid
Northglenn, CO

Reported 06/03/2022 12:00 AM
Project Title

Engineering - Wes Brown Water Treatment Plant Clarifier Tube Replacement and Maintenance

Physical Address View project details and contacts
City, State (County) Thornton, CO 80229   (Adams County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status Accepting Qualifications, Construction Start Expected June 2023
Bids Due View project details and contacts
Estimated Value $290,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Clarifier Tube Replacement and Rehabilitation Replacement of the tube settler system for each of the four (4) existing circular upflow solids contact clarifiers. The existing system was manufactured by Meurer Research, MRI. As-builts and installation drawings are available upon request. The Project will include any disassembly and reassembly of existing clarifier equipment for the proper removal of existing tubes and installation of the new tube settler system; includes remove and reinstall of stainless steel plates that circle the bell and lay on top of the tube settlers. Cathodic protection systems for the four (4) clarifiers will be replaced in kind. Waterproof coating of all four (4) clarifiers is required, including recoating all of the normally submerged carbon steel elements. Major elements include the rake mechanism, center column, reaction well, draft tube, impeller, drive cage, support structure, influent pipe, and minor miscellaneous elements. Preparation of all surfaces to be coated shall be included. Air Compressor Replacement of one 30 HP air compressor with new 40 HP variable speed rotary air compressor. The air compressor shall be Quincy QGV-40 to match the existing air compressors that were recently replaced. A master controller will be installed to control all three air compressors. Master controller will include a gateway to provide access to SCADA from the proprietary network. As-builts available upon request.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents