Similar Projects
Loomis Street to Blaine Street Relief Sewer
Infrastructure
Bidding
North East, PA 16428

FY 2017 CDBG Storm Sanitary Sewer Separation Project
Post-Bid
Erie, PA 16500

Grahamville Street Sanitary Sewer Extension
Post-Bid
North East, PA

Contract 1 General Construction - Iroquois Avenue - East Lake Road Sanitary Sewer Conveyance System Project
Results
Harborcreek, PA 16421

Taggert Street Sanitary Sewer Replacement Project
Results
Wesleyville, PA 16510

Franklin Road, Miller Avenue and Water Street Sanitary Sewer Construction Project
Post-Bid
Fairview, PA 16415

Sewer Line Chemical Root Control
Results
$37,950 est. value
Erie, PA

Sanitary Sewer Improvements
Post-Bid
Albion, PA

North Main Street Sanitary Sewer Extension
Infrastructure
Results
McKean, PA 16426

Wastewater Sewer Mains to Retrieve the Flow Data From Each Manhole
Infrastructure
Post-Bid
Erie, PA

Depot Road Area Smoke and Dye Testing Project
Infrastructure
Post-Bid
Harborcreek, PA

South Street 2021 Sanitary Sewer Replacement Project
Infrastructure
Post-Bid
Erie, PA 16510

Wesleyville Borough Center Street Sanitary Sewer Replacement Project
Infrastructure
Post-Bid
Wesleyville, PA 16510

Sink, Grease Trap, and Deck Drain Installation - USCG Station Erie - Pennsylvania
Term Contract
Post-Bid
Erie, PA 16507

Oliver Road Pump Station Project
New Construction, Infrastructure
Post-Bid
$1,200,000 est. value
Erie, PA

Last Updated 09/02/2021 08:29 AM
Project Title

Zuck Road Sanitary Sewer Relocation Project

Physical Address View project details and contacts
City, State (County) Erie, PA 16511   (Erie County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Materials and installation of approximately 209 linear feet of 10”gravity sewer, 30 linear feet of 18” steel casing pipe jacked and bored into place, 5 manholes, approx. 225 square yards of PennDOT permanent pavement replacement, landscape restoration and all related appurtenances.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents