Similar Projects
Z--NAVFACSW Competitive Small Business Set-Aside Multiple Award Service Contract (MASC) for Grounds Maintenance and Landscaping, and Pavement Clearance Work to be Performed at Various Locations
Term Contract
Post-Bid

Goose Point Fire Secondary Aerial Seeding
Post-Bid
Payson, UT 84651

Saratoga Springs Redwood Road Landscape Restoration
Term Contract
Results
Saratoga Springs, UT 84045

1200 West Pressurized Irrigation
Results
Springville, UT 84663

2020 Pressure Irrigation Improvements
Post-Bid
Lehi, UT 84043

Ground Cover and Seeding Application 2020 IDIQ
Results

Pony Express Parkway Median Improvements
Post-Bid
Eagle Mountain, UT 84005

Landscaping Services for University of Utah Health and Community Clinics
Term Contract
Post-Bid
Centerville, Farmington, Midvale, Orem, Salt Lake City, South Jordan, West Valley City, UT 84009

Landscaping Spanish Fork City All Abilities Park
Post-Bid
Spanish Fork, UT 84660

Lehi City Pioneer Crossing Landscape Maintenance
Term Contract
Post-Bid
Lehi, UT 84043

Springville Power Department Tree Trimming
Term Contract
Post-Bid
Springville, UT 84663

Energized Line Clearance
Term Contract
Post-Bid
Lehi, UT

Grove Creek 1, 6, And 8
Renovation
Post-Bid
Pleasant Grove, UT 84062

Tree Removal, Pruning, Stump Grinding
Term Contract
Post-Bid

Bayhill Park Landscape Improvements
Post-Bid
Cedar Hills, UT

Reported 10/15/2020 12:00 AM
Project Title

2021 Shrub Seedlings for Utah Central Region

Physical Address View project details and contacts
City, State (County) Springville, UT 84663   (Utah County)
Category(s) Single Trades
Sub-Category(s) Landscaping/Irrigation
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide seedlings with roots that fill pots measuring 10 -inches in depth and 2.5” in diameter (D-40 pot), and containing a Vexar tube extending from the bottom of the pot to a minimum of 20 inches above the top of the pot. Plants should have at least two growing seasons (e.g. planted Fall of 2020 and grown in greenhouse over winter, then grown in regular growing season of Spring and Summer and by November 10, 2021.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents