Similar Projects
Ingrando Park Parking Lot - F-000851 - City of Houston
Infrastructure
Conception
$1,220,000 est. value
Tampa, FL 33606

Gas Worx - Phase 1
New Construction, Infrastructure - 20,000 SF
Design
$175,000,000 CJ est. value
Tampa, FL 33605

East Selmon Expressway Slip Ramps Design-Build
Design
Tampa, FL

RFP D/B - US Business 41
Infrastructure
Bidding
$40,000,000 CJ est. value
Thonotosassa, FL 33592

RFP D/B - US Business 41
Infrastructure
Bidding
$40,000,000 CJ est. value
Thonotosassa, FL 33592

CDBG Street Resurfacing
Post-Bid
Plant City, FL

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

I-75 Big Bend Road
Results
FL

I-75 MLK DDI
Results
FL

Springhill Suites by Marriott - North Franklin Street / Tampa
New Construction, Infrastructure
Pending Verification
$37,400,000 CJ est. value
Tampa, FL 33602

Downtown Tampa Interchange (I-275/I-4) Safety and Operational Improvements - Florida Department of Transportation
Infrastructure
Pending Verification
$223,000,000 CJ est. value
Tampa, FL 33602

Amazon Delivery Station / Tampa
Demolition, Infrastructure, Build-out - 123,769 SF
Design
$20,000,000 CJ est. value
Tampa, FL 33611

Sidewalk Construction (Citywide)
Infrastructure
Bidding
$1,500,840 CJ est. value
Tampa, FL 33602

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

General Asphalt Resurfacing
Term Contract
Results
Temple Terrace, FL

Last Updated 09/13/2022 12:07 PM
Project Title

Roseland Park Subdivision Drainage and Roadway Improvements Project

Physical Address View project details and contacts
City, State (County) Plant City, FL 33563   (Hillsborough County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $1,800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call construction of new streets, curbs and gutters, sidewalks, driveways and drainage systems. As of August 10, 2022, the project is in design. A timeline for construction has not been released.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents