Similar Projects
B & F Gulf Service Station
Bidding
$537,801 est. value
Mount Vernon, KY 40456

Poultry Research Facility Relocation - Site Development
Bidding
Versailles, KY 40383

Belknap Campus New Residence Hall Phase 2 - Bid Pack 1
New Construction
Post-Bid
Louisville, KY 40292

Maggie Cane Road Elevation - Site Development
Post-Bid
Barbourville, KY 40906

Cold Spring Site Improvements / Vestibule Addition
Results
Cold Spring, KY 41076

Preston Highway Spoil Site Improvements
Results
$100,001 to $250,000 est. value
Louisville, KY 40202

Meadows-Northland-Arlington Neighborhood Improvement Phase 6B-1 and 6B-2
Bidding
Lexington, KY

Distribution System Site Development
Renovation
Post-Bid
Burgin, Harrodsburg, KY 40330

James Cooper Slide HP AML Reclamation
Results
$87,985 est. value
McKee, KY 40447

Site Improvements
Post-Bid
Berea, KY

AML Reclamation
Results
$212,989 est. value
KY

St. Claire Medical Center Firestopper Repair
Renovation - 82,000 SF
Post-Bid
Morehead, KY 40351

Site Clearing
Results
Covington, Taylor Mill, KY 41015

Murray-Calloway County Hospital Re-Roofing
Renovation
Post-Bid
Murray, KY 42071

Baseball Field Backstop Safety System
Results
Union, KY 41091

Last Updated 05/14/2021 04:17 PM
Project Title

Butler Loadout AMD Reclamation

Physical Address View project details and contacts
City, State (County) KY   (Butler County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $88,572
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To access the site from Morgantown KY, take KY 70 approximately 4.0 miles traveling southwest until reaching KY 1117. Turn right on KY 1117 and travel approximately 3.8 miles until reach a gravel road on the right. Travel approximately 0.5 miles until entering the site. Site coordinates: 37°14'4.26"N 86°47'5.77"W The AMD project consist of an abandoned coal load out area used to load coal onto barges. Coal refuse is acidic and the site is unable to support vegetation. The abatement plan is to “flip and cover”; soil materials (capable of supporting vegetation) existing beneath the coal refuse will be excavated and place over the coal refuse. This will be done under the Earthwork bid item. Domestic, Industrial, & Mining Debris disposal is setup to properly dispose of existing items as described in the plans. Erosions control blanket and silt fence are setup for sediment control. Seedbed preparation, seed, fertilizer, mulch, & ag lime is setup to establish vegetation. Dense grade aggregate and roadway stone is setup for access.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents