Similar Projects
Millspring Village Subdivision
New Construction, Infrastructure
Conception
$44,000,000 CJ est. value
Greenville, SC 29617

Zoo Walkway Repaving - City of Greenville
Infrastructure
Conception
$366,500 CJ est. value
Greenville, SC 29601

The Alliance
New Construction, Infrastructure - 33,000 SF
Design
$15,000,000 CJ est. value
Greenville, SC 29607

The Alliance
New Construction, Infrastructure - 33,000 SF
Design
$15,000,000 CJ est. value
Greenville, SC 29607

Rhett Street Sewer Upgrades
Infrastructure
Bidding
$500,000 CJ est. value
Greenville, SC 29601

Rhett Street Sewer Upgrades
Infrastructure
Bidding
$500,000 CJ est. value
Greenville, SC 29601

Inland Port Greer, East and West Container Yard Expansion
Infrastructure
Post-Bid
$600,000 CJ est. value
Greer, SC 29651

Inland Port Greer, East and West Container Yard Expansion
Infrastructure
Post-Bid
$600,000 CJ est. value
Greer, SC 29651

GA Development Area-Phase 1A Paving
Alteration
Results
Greer, SC

Safety Improvements - Spartanburg/Greenville County
Infrastructure
Results

BridgeWay Station Mixed-Use / Mauldin
New Construction, Infrastructure - 300,000 SF
Construction
$100,000,000 CJ est. value
Simpsonville, SC 29681

White Plains Warehouse
New Construction, Infrastructure - 408,000 SF
Construction
$44,000,000 CJ est. value
Piedmont, SC 29673

Greenville Triumph Stadium
New Construction
Pending Verification
$38,600,000 est. value
Mauldin, SC

Parkers Summit Subdivision
New Construction, Infrastructure
Pending Verification
$66,000,000 CJ est. value
Greenville, SC 29601

Laurens Road Swamp Rabbit Trail (SRT) - City of Greenville
Infrastructure
Conception
$1,500,000 est. value
Greenville, SC 29613

Last Updated 11/14/2022 10:10 AM
Project Title

Greenville Triumph Soccer Stadium Phases 1 & 2

Physical Address View project details and contacts
City, State (County) Mauldin, SC 29662   (Greenville County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Site Development, Stadium
Contracting Method Competitive Bids
Project Status Schematic Drawings, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $36,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for two Phases. Phase 1 would be a Base design to get the Pitch, Lights, Seat, Scoreboard in place for the team to play in 2023 season. Phase 2, Full Build Out, to be complete in 2024. As of November 14, 2022, an architect has been selected, and the drawings are in the Schematic Design Phase. A general contractor has not been chosen, and the method of contractor selection has not been determined. A timeline for construction has yet to be announced. The estimated construction value range for Phase 1 is $10,000,000 to $12,000,000. The estimated construction value range for Phase 1 is $24,000,000 to $26,000,000.

Details

Acre, 6 Acre.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Painting and Coating, Special Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Interior Lighting, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Audio-Video Communications.
Division 31 - Earthwork, Site Clearing, Earthwork Methods, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Athletic and Recreational Surfacing, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents