Similar Projects
Northwest Restroom Facility MEP
Renovation, Alteration - 3,500 SF
Bidding
$2,336,300 est. value
West Allis, WI 53214

Time & Material Plumbing
Term Contract
Post-Bid
Milwaukee, WI

HVAC, Plumbing, and Steam Fitting Services
Term Contract
Post-Bid
Eau Claire, WI 54702

Consolidated Fire Response Ranger Station - MEP
New Construction
Results
Less than $1,900,000 est. value
Gresham, WI

Fire Response Ranger Station Replacement -MEP
New Construction
Results
Less than $1,800,000 est. value
Anston, WI

Plumbing Service
Term Contract
Post-Bid
Columbus, WI

Fire Response Ranger Station Replacement Black River Falls Station-MEP
Results
Less than $2,100,000 est. value
Black River Falls, WI

One (1) Grout Pump
Term Contract
Post-Bid
Janesville, WI

Sherman Hall Bathrooms Remodel - MEP
Renovation
Results
Less than $2,300,000 est. value
Oshkosh, WI 54901

Emergency, Maintenance, and Code Related Plumbing and Heating Repair
Term Contract
Post-Bid
WI

Menasha Utilities 2021 Water Main Reconstruction
Results
Less than $700,000 est. value
Menasha, WI

Private Property Inflow and Infiltration Reduction Residential Plumbing Contractors
Post-Bid
Milwaukee, WI

Instructional Space Renovation - MEP
Results
Less than $2,229,000 est. value
Menomonie, WI 54751

Copper Tubing
Term Contract
Post-Bid
Milwaukee, WI

Fox Crossing Utilities - Main Line Reconstruction
Results
$4,300,000 est. value
Winnebago, WI

Last Updated 01/05/2022 03:07 PM
Project Title

Plumbing and Steamfitter Services at WVH-UG

Physical Address View project details and contacts
City, State (County) State-Wide: WI
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Services, defined as Work, to be performed include the furnishing of all labor, materials, tools, equipment, supplies, services, tasks, and incidental and customary work necessary to competently perform on-call plumbing and steamfitter maintenance and repair work at WVH-UG. Work will include the provision of a total maintenance and repair program consisting of a variety of services including, but not limited to, the following: • plumbing from the water supply pump to and including the initial pressure tank and connection to an existing water distribution system • installation and/or repair of sewer and water service piping • major repairs to faucets, valves, pipes, and/or appliances • repair and/or replacement of automatic valves, waste, or drainage pipes • other miscellaneous plumbing and steamfitter components required for the WCH-UG buildings and facilities • additional plumbing related issues as they arise including the services necessary to insure safe, well maintained, influent, effluent, and closed loop systems for WVH-UG employees, residents, and the public. In addition to supplementing and assisting WVH-UG’s personnel for general maintenance and installation plumbing and steamfitter projects, WVH-UG anticipates emergency services, if the need arises.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents