Similar Projects
Newton Farms Park Improvement - City of West Valley City
Infrastructure
Conception
$625,000 CJ est. value
West Valley City, UT 84128

Develop Maple Meadows II - City of West Valley City
Infrastructure
Conception
$2,800,000 CJ est. value
West Valley City, UT 84120

Pura Vita Senior Housing
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
West Jordan, UT 84088

At 2100 Apartments II
New Construction, Infrastructure
Design
$60,000,000 CJ est. value
Salt Lake City, UT 84115

High Temp Water - Phase 4B
Addition, Demolition, Infrastructure, Renovation
Bidding
Salt Lake City, UT 84111

Electrical and Communications Duct Bank from AOC to Gate 7
Infrastructure
Bidding
$300,000 CJ est. value
Salt Lake City, UT 84116

Riverbend Shopping Plaza
New Construction, Infrastructure - 9,000 SF
Sub-Bidding
$2,000,000 CJ est. value
Riverton, UT 84065

SoHi Apartments
New Construction, Infrastructure - 169,093 SF
Post-Bid
$40,000,000 CJ est. value
Salt Lake City, UT 84101

Huntsman Mental Health Institute Utah Translational Research Facility
New Construction, Infrastructure - 185,000 SF
Post-Bid
$105,000,000 CJ est. value
Salt Lake City, UT 84108

20D: Kent Booster Pump Station Replacement Project Contractor Prequalification
Renovation
Results
West Valley City, UT 84120

Blakes Lambing Ground Guzzler Excavation
Infrastructure
Results
Salt Lake City, UT

Gate 39 Reconstruction
Infrastructure, Renovation
Construction
$2,127,962 CJ est. value
Salt Lake City, UT 84116

The Huxley
Demolition, New Construction, Infrastructure
Construction
$83,000,000 CJ est. value
Salt Lake City, UT 84101

Thackeray Towns
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Sandy, UT 84070

Bueno Avenue Apartments
New Construction, Infrastructure
Pending Verification
$24,000,000 CJ est. value
Salt Lake City, UT 84102

Last Updated 01/20/2023 05:05 AM
Project Title

Well No. 8 Pump and Motor Repair and Installation

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84104   (Salt Lake County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $132,420 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Well drilling and operation equipment Granger-Hunter Improvement is requesting proposals for pump & motor repairs and installation for Well No. 8. The work includes pump bowl repairs and assembly, motor rehabilitation, replacement of portions of the tube, shaft and column, installation of bearings, installation of sounder and injection tubes, and startup. There is also an adder for upgrade to a water-lube tube and shaft. This Request for Proposal (RFP) is part of a competitive procurement process which helps to serve the best interests of the District and its customers (Utah Code 63G-6a-702). It also provides each Proposer with a fair opportunity for its products to be considered. Questions regarding this Request for Proposal shall be directed to: Steve Starr Question Submission Close Date 11/1/2022 3:00 PM MDT Water Maintenance Division Manager Granger-Hunter Improvement District 2888 South 3600 West West Valley City, Utah 84119 Telephone: 801.955.2262 Email: s.starr@ghid.org The pump, motor and shaft/column pipe for Well No. 8 have been removed from the well and are currently stored at Nickerson Companys facility at 2301 Indiana Ave, Salt Lake City, UT 84104. Any proposers will be responsible for coordinating with Nickerson for any additional inspection required to develop a proposal. The District will not pay to move any equipment to a different location for inspection. The motor and pump inspection reports are included as an appendix at the end of this RFP. The well shaft is oil-lube.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents