Similar Projects
Avondale Water Tank Rehabilitations CMAR
Infrastructure
Bidding
Avondale, AZ

Water Tank Rehabilitation Project
Post-Bid
Snowflake, AZ 85937

New 300,000 Gallon Water Storage Tank at Well No. 4 Project
Post-Bid
Snowflake, AZ

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Livestock Storage Tanks
Post-Bid
Aguila, AZ

World-Wide Water Storage Tank Remediation
Term Contract
Results

Hospital Hill Tank Renovation
Post-Bid
Hayden, AZ

Underground Storage Tank Removal
Results
$25,000 to $100,000 est. value
Tucson, AZ 85707

Water Storage Tanks
Term Contract
Post-Bid
Hereford, AZ 85615

US EPA Tribal Nation Underground Storage Tank Program Support
Results

15ft Tanks for Willow Beach National Fish Hatchery
Term Contract
Post-Bid
Willow Beach, AZ 86445

Summit 2 Water Tank
Results
$3,000,000 to $4,000,000 est. value
Prescott Valley, AZ 86314

Tank Inspection, Repair, and Coating
Alteration
Post-Bid
Glendale, AZ

Elevated Water Storage Reservoir, Piping and Appurtenances
Results
Winslow, AZ

Last Updated 10/13/2021 02:15 PM
Project Title

Demolition of Existing Steel Water Storage Tank

Physical Address View project details and contacts
City, State (County) Canyon Day, AZ - Albuquerque, NM 85941   (Gila (AZ) - Bernalillo (NM) County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

100% Native Owned Small Business . Demolition of Existing Steel Water Storage Tank (18,000 Gallon) - 1 Each John F. Kennedy Day School, Cedar Creek, Arizona. Contractor shall provide, equipment, material and professional services required to demolish and make proper disposal I accordance with applicable regulatory requirements of scrap metal associated with the removal of the existing Ground Storage Tank (GST). Work includes demolition of one (1) welded steel water GST and the concrete foundation for JFK GST are 120,000 gallons respectively. The project includes demolition, hauling, and proper disposal of the steel tank and one (1) concrete foundation, in accordance with local and state regulations. Additionally, contractor shall furnish all necessary investigations, studies, travel, and all costs associated with this project.

Details

Division 02 - Existing Conditions, Demolition, Structure Demolition.
Division 05 - Metals.
Division 31 - Earthwork.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents