Similar Projects
Bell Roth Park Irrigation and Drainage
Infrastructure, Alteration
Bidding
Thornton, CO 80260

Reunion Village 8 Filing 1 District Improvements
Infrastructure
Bidding
Commerce City, CO

Copperleaf Water Quality Pond J Improvements
Post-Bid
$450,000 to $625,000 est. value
Aurora, CO

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Maroon Creek Trail Bridge
Results
$100,000 to $240,000 est. value
Aurora, CO 81611

Groundwater Recharge Ponds Pilot Project
Results
Thornton, CO

Reunion Center Duet Phase District Improvements
Infrastructure
Bidding
Commerce City, CO 80022

High Point PD1 Pond Project
Infrastructure
Post-Bid
Denver, CO

Quincy Intertie Improvements
Results
$7,400,000 to $8,400,000 est. value
Aurora, CO

Box Elder Infrastructure Project Phase I
Infrastructure
Bidding
Aurora, CO

48th Avenue Grading Project
Infrastructure
Post-Bid
Aurora, CO

152nd Avenue and Imboden Road Drainage Improvements
Results
CO

Reunion Pond Maintenance
Infrastructure
Bidding
Commerce City, CO

Underground Drainage Pipe Cleaning
Term Contract, Infrastructure
Post-Bid
Thornton, CO

South Platte Bank Stabilization
Results
$1,830,000 to $2,200,000 est. value
Aurora, CO

Last Updated 12/20/2021 10:35 AM
Project Title

Peoria Street Bridge Replacement over the Little Burlington Ditch

Physical Address View project details and contacts
City, State (County) Commerce City, CO 80022   (Adams County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $686,192
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Peoria Street Bridge is located approximately 50 feet south of East 112th Ave on Peoria Street. It is a steel stringer and metal deck bridge with H-Pile foundation and abutments. Corrugated metal back walls support the earth embankment. The bridge is to be removed and replaced with a cast in place four sided box culvert. The Box Culvert is in the FRICO irrigation ditch, Little Burlington Ditch and will require following FRICO guide lines for working in their easement.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Bridges.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents