Similar Projects
New Unused 3-Inch Diaphragm Pump
Post-Bid
Wallingford, CT

Primary Sludge Pump and Primary Settling Tank Mechanism Replacements
Post-Bid
Less than $350,000 est. value
Portland, CT

John S. Roth Wellfield Improvements
Results
$1,700,000 est. value
Middletown, CT

Chemical Improvements at the North Sleeping Giant Wellfield
Results
Hamden, CT

KSB Model KRT K 100-251/164XG Submersible Pump
Post-Bid
New Canaan, CT

Preventative Maintenance, Inspection and Repairs to the Hartford and Berlin Pump Stations and Generators
Term Contract
Results
Hartford, CT 06106

Well Pump Installation
Infrastructure
Post-Bid
Woodbury, CT 06798

Pool Pump Replacement at Town Pool High Plains Community Center
Results
Less than $15,075 est. value
Orange, CT 06477

Grinder Units for Scum and Sludge Transfer Pumps
Results
Stamford, CT

Repair of Johnston 24PO-1 Stage Vertical Storm Water Pump 2 at Cummings Pump Station
Term Contract
Results
Stamford, CT

Well Testing and Drilling Services
Results
Less than $82,150 est. value
Mansfield Center, CT 06250

Occum Hall Fire Pump Replacement Project
Results
Windham, CT 06226

High Rise Geothermal Heat Pumps Replacement
Results
$197,800 est. value
Windham, CT 06226

Grinder Pump for Low Pressure Sewer Collection System
Results
Waterford, CT

Citywide Maintenance and Repair of Various Drains and Pumps
Results
Stamford, CT

Last Updated 08/05/2021 01:09 PM
Project Title

Rehabilitation and Reconditioning of Fish Wells at Two State DEEP Hatcheries

Physical Address View project details and contacts
City, State (County) Kensington, CT   (Hartford County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents