Similar Projects
Last Updated | 01/12/2023 08:09 AM |
Project Title | LEG Cafeteria Remodel and Equipment Upgrade |
Physical Address | View project details and contacts |
City, State (County) | Olympia, WA 98504 (Thurston County) |
Category(s) | Government/Public |
Sub-Category(s) | Misc. Buildings |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected February 2023 |
Bids Due | View project details and contacts |
Estimated Value | $311,800 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | LEG Cafeteria Remodel and Equipment Upgrade ESTIMATED BID COST RANGE: $505,000.00 to $555,000.00 FPS will be accepting mailed-in or hand-delivered bids. Clearly identify that it is a SEALED BID on the outside of the envelope. Include an attention line in the address to ensure that the bid is routed correctly. For hand-delivering bids, a locked drop box will be available inside the 1500 Jefferson St. S.E. building for contractors to deposit their sealed bids. An FPS staff member will be inside the lobby monitoring the locked drop box during those hours. Additionally, all Public Works Bid Openings will be conducted via live stream on YouTube. A link to the live stream for bid opening can be found above. Contractors and the public will not be allowed to stay to watch the bid opening in person. We will strive to begin bid opening live streams within thirty minutes of the bid closing and appreciate your patience as we deploy this new process. If you have questions, please contact us at EASMail@des.wa.gov or call (360) 902-7272 (voice message only). Please direct questions regarding this project to the office of the Consultant. Within 72 hours following the bid opening, results will be available on the FPS portal The State of Washington prevailing wage rates are applicable for this public works project located in Thurston County. Bidders are responsible to verify and use the most recent prevailing wage rates. The "Effective Date" for this project is the Bid Form due date above. The applicable prevailing wage rates may be found on the Department of Labor & Industries portal Supplemental Bidder Responsibility will be evaluated for this project. In determining Bidder responsibility, the Owner shall consider an overall accounting of the criteria set forth in "DIVISION 00 SUPPLEMENTAL RESPONSIBILITY CRITERIA". Please direct questions regarding this subject to the office of the Consultant. Voluntary numerical Diverse Business goals of 10% MBE, 6% WBE, 5% Washington Small Business, and 5% Veterans have been established for this project. Achievement of the goals is encouraged. The State reserves the right to accept or reject any or all bids and to waive informalities. |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |