Similar Projects
Electrical, Framing, Mechanical, Flooring,Plumbing, Drywall
Alteration
Design
San Francisco, CA 94128

RFQ Engineering - Engineering Services for the Construction of the Temperance Avenue Sewer Trunk Line
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Fresno, CA 93721

Harbor Patrol Maintenance Shed Renovation
Infrastructure
Bidding
$150,000 CJ est. value
Santa Barbara, CA 93101

Butterfly Valves for Ramona Pipeline Valve Replacement
Infrastructure
Sub-Bidding
$1,500,000 CJ est. value
San Diego, CA 92101

Commercial Industrial Services (CIS) Pumps and Motors Repair
Term Contract
Sub-Bidding
San Diego, CA 92136

As Needed Plumbing Maintenance and Repair for Metropolitan's Eagle Mountain Pumping Plant Housing
Term Contract, Alteration
Post-Bid
$240,000 est. value
Desert Center, Los Angeles, CA 90012

On-Call Plumbing Services
Alteration
Post-Bid

Industrial Water Treatment Services
Alteration
Results
$100,000 est. value
San Diego, CA

SDIA - Airport Administration Building - Plumbing
Alteration
Results
San Diego, CA 92108

Phase 1A Water CIP
Infrastructure
Construction
$1,313,318 CJ est. value
Stockton, CA 95202

Wastewater Treatment Plant Transfer Pumps Improvements Project
Infrastructure
Bidding
$365,600 CJ est. value
San Mateo, CA 94404

Seismic Monitoring Container Vault Replacement
Renovation
Sub-Bidding
$130,000 CJ est. value
Alder Springs, CA 95939

Architectural Engineering And Related Professional Technical Support Services
Term Contract
Post-Bid
CA

As Needed Plumbing Maintenance and Repair for Metropolitan`s Gene Pumping Pump Plant
Term Contract
Results
$240,000 est. value
Los Angeles, CA

Lemoore Sanitary Sewer Lift Station 9
Infrastructure
Bidding
$3,750,000 CJ est. value
Lemoore, CA 93245

Last Updated 06/29/2023 08:33 PM
Project Title

Phase 4, 5, and 6 Arden Service Area Pipe and Meter Installation Project

Physical Address View project details and contacts
City, State (County) Sacramento, CA 95814   (Sacramento County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $51,960,700 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The construction of 12-inch, 10-inch, 8-inch, and 6-inch waterlines and associated appurtenances including fire hydrants, valves, etc. The project also consists of installation of meter replacements, residential metered services, and commercial metered services with backflow assemblies. Included in the work will be reconnection of customer services from the new mains and abandonment of the existing services and appurtenances. Question Deadline 06/08/2023 at 4:00 PM PT

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents