Similar Projects
Osage Hills Addition Phase 2
New Construction
Conception
Maumelle, AR

Watershed Pointe / Divide Highway
New Construction, Infrastructure
Conception
$11,700,000 CJ est. value
Little Rock, AR 72212

Fox Meadow Subdivision
New Construction, Infrastructure - 35,000 SF
Design
$3,900,000 CJ est. value
Siloam Springs, AR 72761

Devoe Bend Single Family Home Subdivision
New Construction
Design
Maumelle, AR

New Residence at Cane Creek State Park
New Construction, Infrastructure - 1,784 SF
Bidding
$528,000 CJ est. value
Star City, AR 71667

Moderate Rehabilitation of a Residential Building
Renovation
Post-Bid
Fayetteville, AR

Moderate Rehabilitation of a Residential Building
Renovation
Post-Bid
Fayetteville, AR

Fire Damage to Unit 91
Renovation
Results
West Memphis, AR 72301

Construction of a New Multipurpose Building for Modernization Project CFP 2022
New Construction, Infrastructure - 2,800 SF
Results
$737,000 CJ est. value
Osceola, AR 72370

Aiden's Place
New Construction
Construction
Fayetteville, AR 72704

Pinnacle Heights
New Construction
Construction
Maumelle, AR

Country Club Of Arkansas
New Construction
Pending Verification
Maumelle, AR

Morning Star Subdivision
New Construction, Infrastructure
Pending Verification
$45,000,000 CJ est. value
Bentonville, AR 72712

Millers Creek Subdivision Phase 1
New Construction, Infrastructure
Conception
Conway, AR 72032

Service Park Subdivision
New Construction, Infrastructure
Design
Jonesboro, AR

Last Updated 04/03/2023 02:08 PM
Project Title

Kitchen Renovation at East Side Gardens

Physical Address View project details and contacts
City, State (County) Trumann, AR 72472   (Poinsett County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

All bids must be submitted on forms furnished by the PHA, submitted in duplicate and submitted in a sealed envelope plainly marked to show the name and address of the bidder, contract job number, and date and time of bid opening. Bidders are required to have an Arkansas Contractor License. This is in accordance with Arkansas State Statue 71-701 et seq. Each bid submitted must contain the items listed in Specification Section 00151, Page 1, Item 1. The successful bidder shall be required to furnish an Arkansas Performance and Payment Bond or Bonds in the amount of 100 percent of the Contract Bid for contracts that exceed $25,000 in accordance with Arkansas Statue 18-44-503. The PHA reserves the right to reject any or all bids or to waive any informalities in the bidding. No bid shall be withdrawn for a period of sixty (60) days subsequent to the opening of bids without the consent of the PHA.

Details

Single-Family Homes, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents