Similar Projects
Fort Douglas 3 Mg Tank Project
Results
Less than $5,898,874 est. value
Salt Lake City, UT

Zion Ponderosa Wood Fuels Reduction
Post-Bid
Kanab, UT 84741

New Utah State Correctional Facility Construction Project
Post-Bid
Layton, UT

Trailer Mounted Fuel Tank Scrubbing and Filtration Unit
Results
Salt Lake City, UT 84116

Gas Line & Fuel Swap at Tooele Army Depot
Post-Bid
$5,000,000 to $10,000,000 est. value
Tooele, UT

Upgrade Fuel Tanks
Results
Riverton, UT

Bulk Fuel Tanks
Results
Springville, UT 84663

Malcomb Springs 3 Million Gallon Water Tank
Post-Bid
$4,000,000 to $4,500,000 est. value
Spanish Fork, UT

Membrane Filtration Equipment
Post-Bid
Mount Pleasant, UT

4200 West Pump Station Surge Tank Installation Project
Infrastructure
Results
Riverton, UT

Dugway Proving Ground (DPG) Propane Delivery, Distribution, and Tanks
Term Contract
Results
Dugway, UT

NPS Fuel Dispenser Replacement, Canyonlands National Park, UT
Term Contract
Post-Bid
Hanksville, Moab, UT

NPS Fuel Dispenser Replacement, Canyonlands National Park, UT
Term Contract
Post-Bid
Hanksville, Moab, UT

DFCM Construction - Pre Qualified Mechanical - DNR Building Natural Gas Line Replacement
Infrastructure
Results
$170,000 est. value
Salt Lake City, UT 84116

New Water Reclamation Facility Project SW-2 Standby Power and Susbstation
New Construction, Infrastructure, Alteration
Post-Bid
Salt Lake City, UT 84116

Last Updated 12/20/2021 08:07 AM
Project Title

Propane Tank And Tank Installation

Physical Address View project details and contacts
City, State (County) Kanab, UT   (Kane County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A 30,000-gallon propane tank to be built to specific specs, and to be installed underground according to specific specs. This propane tank will be installed for use at the new Kanab Elementary School site in Kanab, Utah. Installation to start approx. Sept. 1 and be completed by Sept. 20, 2021

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents