Similar Projects
Saddle Ridge
New Construction
Conception
Cheyenne, WY

Tenth Hole Estates - Phase III
New Construction - 3,000 SF
Conception
$1,000,000 to $5,000,000 est. value
Gillette, WY

SCSD 2 Maintenance Facility Safety Upgrades and Repairs
Renovation, Infrastructure - 9,360 SF
Design
$450,000 CJ est. value
Sheridan, WY 82801

Military Working Dog Kennel F.E. Warren AFB, Wyoming
Demolition, New Construction, Infrastructure - 4,510 SF
Design
$323,292 CJ est. value
Fe Warren Afb, WY 82005

Plum Alley Waterline
Infrastructure
Bidding
$400,000 CJ est. value
Pavillion, WY 82523

White Mountain Water Well
Infrastructure
Bidding
$100,000 CJ est. value
Rock Springs, WY 82901

Yellowstone National Park - Cody (Cody Tunnels)
Infrastructure
Sub-Bidding
$700,000 CJ est. value
Cody, WY 82414

Daniel Jct - Bondurant Rd (US 189/191)
Infrastructure
Sub-Bidding
$80,000 CJ est. value
Pinedale, WY 82941

Tunnel #2 Cave-in Restoration
Alteration
Post-Bid
Torrington, WY

Sheridan County Court House and Jail Renovation
Renovation, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Sheridan, WY 82801

District 3 Stockpiles
Infrastructure
Results

District 3 Stockpiles
Infrastructure
Results

Dinosolar Solar Energy System
Infrastructure
Pending Verification
$266,617,340 CJ est. value
Casper, WY 82604

Mountain Acres
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Casper, WY 82601

Tiley Subdivision
New Construction
Conception
$2,000,000 est. value
Burns, WY 82053

Last Updated 08/16/2022 03:33 AM
Project Title

RFQ Construction Manager at Risk - Construction Manager at Risk (CMAR) Jackson Region Employee Housing Project Phase 1

Physical Address View project details and contacts
City, State (County) Jackson, WY 83001   (Teton County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Request for Statements of Qualifications Construction Manager at Risk (CMAR) Jackson Region Employee Housing Project Phase 1 The State Construction Department (Procuring Agency) will be accepting Statements of Qualifications (SOQs) from qualified Construction Managers at Risk (CMAR) for the Wyoming Game & Fish Department s Jackson Region Employee Housing Phase 1 project in Jackson, WY. This project will consist of CMAR services to provide comprehensive preconstruction and the possibility of construction management services for the Jackson Region Employee Housing Phase 1 project. This is not a Request for Proposals. The State of Wyoming is not obligated by this announcement to award any contract. Responding Construction Managers at Risk (CMAR s) may be invited to submit proposals pending the outcome of this request for qualifications. Estimated Project Completion date (Phase 1): June 2024

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents